Skip to content
Abierto

Sources sought

JBLM MDTF BLDGs 3223-3224 Construction Consolidation, Joint Base Lewis McChord, Washington

W912DW25R12MB

Department of the Army, W071 Endist Seattle. Commercial and Institutional Building Construction.

Response deadline

February 19, 2025 at 4:00 PM EST

Closed 576 days ago. Posted February 12, 2025. Scheduled to archive March 6, 2025.

Description

As published on SAM.gov.

General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. Project work will preserve existing columns, beams, floors, and roof structural framing.

The definitive removal / demolition work items for each building will require: a) Hazardous material / debris abatement and removal mostly within the crawl space b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, c) Removal at ~ 90% removal of building mechanical – electrical systems d) Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: e) New exterior envelope f) New building mechanical – electrical systems g) New roof TPO system Other considerations for site work coordination a) New utility connections (mostly by other entities) b) Shared construction boundaries with adjacent current and future projects

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 12, 2025

    Sources sought

    Due February 19, 2025 at 4:00 PM EST. SAM.gov, notice da224054530a4671a14ba1b248adc86d

Points of contact