Construction of B-21 Radio Frequency (RF) Hangar

W912DQ26RA019

Department of the Army, W071 Endist Kansas City. Commercial and Institutional Building Construction.

Response deadline

June 18, 2026 at 1:00 PM EDT

Closed 92 days ago. Posted June 10, 2026, first published November 13, 2025. Scheduled to archive July 16, 2026.

Description

As published on SAM.gov.

06102026

Discovered that drawings were missing and added with amendment

06042026

Final amendment posting.

CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE) Kansas City District (NWK) intends solicit, negotiate, and award a one-time Unrestricted, Firm-Fixed-Price, Design-Bid-Build, construction contract to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. at Whiteman Air Force Base (WAFB), MO.

Scope of Work: The scope of this contract is to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. The facility will consist of both unclassified and classified spaces for a total square footage of 5,345 square meter (57,532 square feet).

Structure will feature a new reinforced concrete foundation by replacing the paved area east of the existing Phase Hangar (Building 9), a metal roof, metal siding panels on steel framing and girts above a masonry cavity wall and Concrete Masonry Unit wall assembly around the base of the facility, and powered steel sliding hangar doors. The project will also include supporting facilities such as utilities, pavements, site improvements, and other necessary infrastructure to have a complete and usable facility. Update includes SF30, W912DQ26RA019 0002, located in PIEE and corrected response date and time.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 13, 2025

    Sources sought

    Project Labor Agreement (PLA) for Construction of B-21 Radio Frequency (RF) Hangar, Whiteman AFB

    Due November 25, 2025 at 12:00 PM EST. SAM.gov, notice 19f99687f48a4926abed7e26f80ba551

  2. March 18, 2026

    Presolicitation

    Due April 2, 2026 at 4:00 PM EDT. SAM.gov, notice e7a65cd0d610441da75f706de0e978b9

  3. April 1, 2026

    Solicitation, originally presolicitation

    Due June 15, 2026 at 4:00 AM EDT. SAM.gov, notice e4c419c77c5c441a93c50379e73bd55e

  4. April 2, 2026

    Solicitation

    Due June 15, 2026 at 4:00 AM EDT. SAM.gov, notice 3170346d7fbd49e188a5771674c4299c

  5. April 3, 2026

    Solicitation

    Due June 15, 2026 at 4:00 AM EDT. SAM.gov, notice 4e63a77063924fe5b7a4a728f9521794

  6. April 8, 2026

    Solicitation

    Due June 15, 2026 at 4:00 AM EDT. SAM.gov, notice 5fa741fb68d24615a81752221d0f7ca1

  7. May 5, 2026

    Solicitation

    Due June 15, 2026 at 4:00 AM EDT. SAM.gov, notice 6fcbfcd39a3d4620be80cad89a193c2a

  8. May 29, 2026

    Solicitation

    Due June 16, 2026 at 1:00 PM EDT. SAM.gov, notice 56027e8183a14002aea09e3c444f7728

  9. June 4, 2026

    Solicitation

    Due June 16, 2026 at 1:00 PM EDT. SAM.gov, notice 54e6fe3e8c3b43ec8422ec5a03f40f1f

  10. June 10, 2026

    Solicitation

    Due June 18, 2026 at 1:00 PM EDT. SAM.gov, notice a0da45e7026c49dc9f47c359f5084ab7