RFI - Denison Stations Service Generator Rehab

W912BV25FTA06

Department of the Army, W076 Endist Tulsa.

Response deadline

April 14, 2025 at 3:00 PM EDT

Closed 522 days ago. Posted March 13, 2025. Scheduled to archive April 29, 2025.

Description

As published on SAM.gov.

DENISON STATION SERVICE SCOPING LIST AND ASSUMPTIONS SUMMARY SCOPE OF WORK The Denison Powerhouse is located on the Red River, five miles north of Denison, Texas. The project contains two 35,000 kilowatt (kW) units with a total rated generating capacity of 70,000 kW. The rated (overload) generation capacity is 80,500 kW. The powerhouse produces an estimated average annual energy amount of 219,000 kilowatt-hours.

Unit 1 became operational in 1945 and Unit 2 became operational in 1949. The powerhouse has two original station service units which provide power for auxiliary equipment to operate the main units. There is no emergency generator, as the two station service units act as backup power sources for each other. The station service units have incurred over 70 years of wear, including normal cavitation damage to the turbine runners and wicker gates.

Due to their deteriorated condition, the station service units are losing reliability. The Army Corps of Engineers is seeking sources to conduct rehabilitation and/or replacement of a wide range of components, as articulated below, associated with these Station Service units. The following systems will require any combination of inspection, repair, and/or replacement. Testing and commissioning plans will also be required.

MECHANICAL SYSTEMS Mechanical Governor Brake System Raw Water System Bearing Oil Systems Lifting devices for GSU disassembly Greasing System Scroll Case/ Draft Tube drain valves Butterfly Valve GENERATION EQUIPMENT Excitation System Generator TURBINES Runner Draft Tube Cone Wicket Gates & Operating Mechanism Stay Ring/Spiral Case Headcover/Operating Ring/Turbine Guide Bearing Housing Bottom Ring & Mounting Surface Operating Ring, Connecting Rods, and Rocker Arms Shafts Turbine Shaft Packing Box Wicket Gate Servomotor Turbine and Generator Guide Bearings Reassembly/Disassembly CONTROLS All controls to be replaced.

Various Temperature Meters/Gauges/Alarms required in Governor Cabinet or Instrumentation Boards PROTECTION Station Service Unit Annunciation System Protective Relaying STRUCTURES Minor repair/refurbishment to draft tube components.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 13, 2025

    Sources sought

    Due April 14, 2025 at 3:00 PM EDT. SAM.gov, notice 9bc8eb0914d74ae68d6523818ac2aae9

Points of contact