Skip to content
Abierto

Sources sought, total small business set-aside

Savannah ANG Tank Repairs

W9128F26RA090

Department of the Army, W071 Endist Omaha. Oil and Gas Pipeline and Related Structures Construction.

Response deadline

April 24, 2026 at 3:00 PM EDT

Closed 147 days ago. Posted March 27, 2026. Scheduled to archive September 16, 2026.

Description

As published on SAM.gov.

This project includes repairs and maintenance of two vertical aboveground storage Tanks 964 and 967 at Savannah ANG, GA. All Work Complete for Tanks 964 and 967 Repairs (R). Bring all tank repairs into compliance with American Petroleum Institute (API) 653 and all applicable design criteria and standards. The DoD AST Standard AW 78-24-27 shall govern where it conflicts with API 650 or API 653. All tank deficiencies noted in previously performed API 653 inspection report shall be corrected in order to bring the tank into compliance. All Work Complete for Tanks 964 and 967 Maintenance (M) including repair tank coatings, provide tank strapping chart, and perform final API 653 inspection.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 27, 2026

    Sources sought

    Due April 24, 2026 at 3:00 PM EDT. SAM.gov, notice 704503b4bc2f49febc15fec5319e125c

Points of contact