Skip to content
Abierto

Special notice

Airfield Lighting & Control System Services

W9124724R0021

Department of the Army, W6QM MICC Fdo FT Bragg. Electrical Contractors and Other Wiring Installation Contractors.

Awarded

Achuti LLC

$44,482.00 obligated so far on USAspending

Description

As published on SAM.gov.

This is a change to the previous Sources Sought Synopsis (PANMCC23P0000014574). The notice is changed to a Special Notice ONLY for an anticipated procurement of Maintenance and Repair Services for an Airfield Lighting Monitoring Control System at Fort Liberty, NC. The tentative dates for the requirement were also updated within the PWS draft. Please read the Description below an see all attachments.

This notice announces the intent by Mission Installation Contracting Command (MICC) Fort Liberty in support of the Department of Public Works (DPW) to procure Airfield Lighting Control and Monitoring Systems (ALCMS) repairs and maintenance services without competition as prescribed in FAR 13.501(a)(1)(ii). The proposed contract will facilitate the computer Airfield Lighting Control and Monitoring Systems (ALCMS) repairs and maintenance services.

The computer for the ALCMS is the interface between the air traffic control tower and the airport lighting systems located at Pope Army Airfield, NC. It is essential that the system be reliable, and that the system be simple to maintain by airport personnel. The contractor shall maintain and keep the new Airfield Lighting Monitoring Control System current and in good working order. It is important that the contractor shall use only like equipment that the contractor has installed since the equipment upgrade.

The Contractor shall be responsible for servicing, updating, repairing, and providing technical assistance as necessary to ensure operational readiness and compliance with applicable airfield regulations. Contractor shall provide semi-annual routine maintenance services that permit the early detection and correction of items that, if deficient or defective, would interfere with normal operations for the Airfield Lighting Monitoring Control System's equipment listed.

Maintenance work shall include comprehensive operational inspection, updates, and adjustments to ensure the satisfactory functioning of computer software programs, communication systems, switch panels, power systems and computer hardware components. Through market research and historical information, it was discovered that it would be necessary to utilize ADB Safegate Americas LLC, for maintenance and repair of the existing ALMCS equipment and software.

An ADB Safegate regional sales manager, stated in a March 1, 2022 email that the software in its ALMCS systems is proprietary. Additionally, previous market research has been found that there are no small or large companies can provide this service. DPW’s current plan is to procure a maintenance and service repairs contract that will ensure continuous operation of the computer systems. The ALMCS is designed to revert to a fail-safe mode upon computer failure, communications failure, or loss of power.

Under fail-safe conditions, airport lighting equipment that is operating at the time of failure shall continue to work at the same intensity level. This action shall allow DPW to improve airfields maintenance.

The Contractor shall provide all labor, service and repair parts, components, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and nonpersonal services necessary to perform the required maintenance and repair of the airfield lighting control systems, as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property and services or acts of God, which will be procured through an alternate method.

This announcement fulfills the synopsis requirements under FA 5.203(a). MICC-Fort Liberty intends to publish a solicitation no sooner than 15 days after publishing this synopsis. This Special Notice of Intent is not a request for competitive quotes. Information received in response to this notice will be considered solely for the purpose of determining whether a competitive procurement is in the best interest of the Government.

If no written responses are received by the date listed below, which reflects at least fifteen (15) days after the publication of this notice, the solicitation will be issued as sole source requirement.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

Recipient
Achuti LLC
UEI
D8GGP2SJKJ85
CAGE
873W3
Vendor location
Raleigh, NC
Contract
W9124724C0025, definitive contract
Obligated
$44,482.00
Actions
1 between May 7, 2024 and May 7, 2024
Competition
Not Competed Under SAP, 1 offer received
Set-aside reported
8(A) Sole Source
Described as
FZ-20031-24 Install and Repair Main Entr
Match
solicitation number W9124724R0021 equals the FPDS solicitation identifier; same awarding office W91247 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 24, 2024

    Special notice, originally sources sought

    Due February 8, 2024 at 4:30 PM EST. SAM.gov, notice 889c388a794e43febea8295e7565bff1

Points of contact