2 Low Flow Operators for ACS

W9123725QA058

Department of the Army, W072 Endist Huntington. Industrial Valve Manufacturing.

Status

Justification

Posted August 28, 2025. Scheduled to archive September 27, 2025.

Description

As published on SAM.gov.

The Contractor shall furnish, test, and deliver Two (2) low flow gate operator as described herein to Alum Creek Lake, 5905 Lewis Center Rd., Lewis Center, OH 43035-9215. The new operators must be an exact drop-in match for the existing gate operators currently in use and have the exact performance criteria as the originals.

Each low flow gate operator shall be manufactured by Limitorque and include the electric actuator, enclosure, controls, position indication, drive, base, starter, and handwheel as detailed below for a complete motor operated floor stand. The units are to be used to operate a low flow gates on the Alum Creek Dam intake structure. Contractor must install a handwheel on each unit for manual operation. Remote operation for each unit must be successfully checked at the Contractor’s facility during witness testing.

It is recommended for the Contractor to make a site visit to conform the operators they are providing are an exact match to the operators being replaced and to get any details needed to ensure successful remote operation of the gates.The Contractor shall furnish, test, and deliver Two (2) low flow gate operator as described herein to Alum Creek Lake, 5905 Lewis Center Rd., Lewis Center, OH 43035-9215.

The new operators must be an exact drop-in match for the existing gate operators currently in use and have the exact performance criteria as the originals. Each low flow gate operator shall be manufactured by Limitorque and include the electric actuator, enclosure, controls, position indication, drive, base, starter, and handwheel as detailed below for a complete motor operated floor stand. The units are to be used to operate a low flow gates on the Alum Creek Dam intake structure.

Contractor must install a handwheel on each unit for manual operation. Remote operation for each unit must be successfully checked at the Contractor’s facility during witness testing. It is recommended for the Contractor to make a site visit to conform the operators they are providing are an exact match to the operators being replaced and to get any details needed to ensure successful remote operation of the gates.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 28, 2025

    Justification

    SAM.gov, notice a27ff3ef1cb848c5bee15dd40cbc8a8f

Points of contact