Combined synopsis and solicitation
GRADING, DRAINAGE AND PAVEMENT CONSTRUCTION, MAINTENANCE, AND REPAIRS POSTWIDE FORT NOVOSEL, ALABAMA
W911S025BA0001
Department of the Army, W6QM Micc-Fdo FT Eustis. Highway, Street, and Bridge Construction.
Response deadline
March 10, 2025 at 10:00 AM EDT
Closed 557 days ago. Posted March 12, 2025, first published February 7, 2025. Scheduled to archive March 25, 2025.
Description
As published on SAM.gov.
The Purpose of thist is to providee an abstract of offeror's. The Contractor shall provide all labor, materials, equipment, supervision, transportation, and incidentals, except as specified herein as Government furnished, to perform all operations in connection with the grading, drainage, and paving required to construct, repair and maintain roads and parking lots at various locations on Fort Novosel property as directed by the Directorate of Public Works (DPW).
This work is governed by the applicable drawings and these specifications are subject to the terms and conditions of the contract. Drawings of the areas to be paved shall be submitted to the Contractor with individual task orders as required. All drawings provided to the Contractor are for reference/information only and may or may not be current or to scale.
The Contractor shall provide any/all deviations to accepted local, state, and federal building practices/codes to the attention of the Construction Inspector and Contracting Officers Representative for review/consideration by the government. The Contractor shall be responsible for obtaining utility spotting/location and permits that may be required by Environmental Considerations FB-144R. If any work done by the contractor is not according to specifications listed below, that work shall be re-done per specs.
The re-work shall be done at the contractor’s expense. General survey and layout requirements for existing roadways overlays, roadway widening, drainage structures and parking lot overlays shall be part of contractors bid. Where layout and engineering work shall be required for establishing new roadway, parking lots and site work the contractor and government representative shall reach an agreed time frame during the scoping of project.
This cost shall be covered by the Field Engineering and Layout bid item shown on bid schedule. When required, the Contractor is to provide the necessary documentation in order to obtain a NPDES permit for the new construction. When all work is complete, the Contractor shall be required to provide the DPW with a complete set of As-Built drawings (both electronic and hard copy).
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 7, 2025
Combined synopsis and solicitation
Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice d8a60717a6254de48523ad82e209e7ff
March 4, 2025
Combined synopsis and solicitation
Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice eec8943e5dd34d569cf597a55b845e94
March 6, 2025
Combined synopsis and solicitation
Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice 75f8cef0ce774e60b8d8bd258bb2e22e
March 12, 2025
Combined synopsis and solicitation
Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice 47928ebcbcf449e6a69a526d7fcda806
March 12, 2025
Combined synopsis and solicitation
Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice 63bb27ae4f5e406da6e72e50dba3abe4
Points of contact
- Edward WojtanIIIedward.w.wojtan2.Civ@army.mil
Also open from this buyer
- FCC Uninterruptible Power Supply InstallationCombined synopsis and solicitationSmall businessNAICS 238210VirginiaW911S026QA013Closes in 3 daysSep 21
- Holistic Health and Fitness (H2F) Integration Team (HIT)Sources soughtNAICS 621399Newport News, VAW911S026R0H2FCloses in 5 daysSep 23