Sources sought
RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 3
W909MY-26-R-TRLR
Department of the Army, W6QK ACC-APG Cont CT Wash Ofc. Truck Trailer Manufacturing.
Response deadline
May 13, 2026 at 3:30 PM EDT
Closed 128 days ago. Posted May 13, 2026, first published April 27, 2026. Scheduled to archive May 28, 2026.
Description
As published on SAM.gov.
Amendment 3 The government is providing the following clarification for situational awareness; the response deadline remains unchanged.
Question: It is unclear to us whether or not we will be designing the integration solution or just building the hardware based on government provided specs.
The below screenshots from the RFI seem to be sort of contradictory with each other. -Integration Scope: the vendor is responsible for fabricating or procuring all mounting hardware, brackets, cables, and integrating/installing these components and GFE on the trailer IAW the government's TDP. -The vendor is responsible for all non-recurring engineering (NRE) associated with designing the integration solution (e..g. tooling) to meet the performance requirements" Answer: The vendor will be responsible for securely integrating the GFE (generator and trailer).
This integration will require either purchased or fabricated components based on the government TDP. The TDP drawings provided at amendment 001 provide an overview to assist with reasonable estimation. There is some flexibility in which specific components can accomplish the task, which is why any vendor may be able to accomplish assembly either with all purchased parts or chose to fabricate unique ones. If a vendor requires tooling to aid in fabricating unique components, they are responsible for its design and the NRE associated with that.
Amendment 2 The purpose of this amendment is to correct the response deadline in the attached RFI "Request for Information_LTT-HC_Integration_Contracting with PM Amendment 2" to reflect 13 May 2026, 3:30 PM EST
Amendment 1 The purpose of this amendment is to address questions submitted by industry regarding the original RFI posting. Accordingly, the following updates have been made and are provided as attachments to this notice:
Revised RFI Document: Please review the updated RFI for requirements clarifications.
Associated Part Drawings: Supplemental technical drawings have been provided to assist in the development of responses.
Extension of Response Deadline: To ensure industry has sufficient time to review the revised documentation and incorporate these updates into their submissions, the response deadline is hereby extended.
Original Response Deadline: May 11, 2026, at 3:30 PM EST New Response Deadline: May 13, 2026, at 3:30 PM EST
The Department of the Army is conducting market research in accordance with Federal Acquisition Regulation (FAR) Part 10 to identify sources capable of integrating Advanced Medium Mobile Power Sources (AMMPS) Kits onto either the 1-ton Light Tactical Trailer Heavy Chassis (LTT-HC) or the 2.5-ton M200A1 trailer. The Government owns the competitive Technical Data Package (TDP) for this integration, which will be provided as Government Furnished Information (GFI) under subsequent competitive action.
This RFI is for informational and planning purposes only and does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. The Government will not award a contract on the basis of this RFI, nor will it pay for any information submitted by respondents.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 27, 2026
Sources sought
RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits
Due May 11, 2026 at 3:30 PM EDT. SAM.gov, notice d05be48eb94944e790d343ea3d7631ef
May 6, 2026
Sources sought
RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 1
Due May 13, 2026 at 3:30 PM EDT. SAM.gov, notice 03937f666f014a22b761fd974f56a7bd
May 6, 2026
Sources sought
RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 2
Due May 13, 2026 at 3:30 PM EDT. SAM.gov, notice e9574d5e2eae4304b7aeca923d099975
May 13, 2026
Sources sought
Due May 13, 2026 at 3:30 PM EDT. SAM.gov, notice 099b3c1371774c59bca1fa5c12333269
Points of contact
- Mary Sudamary.a.suda.civ@army.mil
- Shahaadah C. Nallsshahaadah.c.nalls.civ@mail.mil