Skip to content
Abierto

Presolicitation, total small business set-aside, first published as sources sought

Synopsis for Overhaul of CH-47 Control Assembly, Quadrant

W58RGZ-26-B-0019

Department of the Army, W6QK ACC-RSA. Aircraft Manufacturing.

Response deadline

April 1, 2026 at 4:00 PM EDT

Closed 170 days ago. Posted March 17, 2026, first published March 3, 2026. Scheduled to archive April 16, 2026.

Description

As published on SAM.gov.

This is a 100% Small Business Set-Aside. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul of the following assets:

NOMENCLATURE:

CH-47 Control Assembly, Quadrant INPUT/OUTPUT NSN:

1680-01-549-4959 INPUT/OUTPUT P/N:

145ES010-8 ESTIMATED QUANTITY RANGE: Minimum 9 each – Maximum 54 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 9 each) This requirement is to fulfill the government’s need for the overhaul of the Control Assembly, Quadrant, NSN 1680-01-549-4959. The proposed contractual action is a five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract. The Control Assembly, Quadrant is not a Critical Safety Item (CSI).

The overhaul shall be accomplished in accordance with Government specifications. The overhaul requires the complete restoration of unserviceable assets to a like-new, fully serviceable, and air-worthy condition in accordance with the specifications outlined in the Depot Maintenance Work Requirement (DMWR) 1-1680-391, Revision date 7/21/2017, Change # 0. This effort is essential for the ongoing sustainment and operational readiness of the CH-47 fleet. An RFP will be issued at a later date for this requirement.

No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow-up information requested. No basis for claim against the Government shall arise as a result of a response to this announcement or Government use of any information provided. All responsible sources may submit an offer which shall be considered by the agency.

The closing date annotated is an estimated date dependent upon the date of the release of the solicitation; however, the solicitation will not open prior to the closing date stated on the synopsis. No telephone requests for the solicitation will be accepted. Foreign firms are reminded that all request for solicitation must be processed through their respective embassies. All responsible sources may submit a proposal which shall be considered by the Agency. This requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. Point of Contact is Cameron Maclin, cameron.a.maclin.civ@army.mil.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 3, 2026

    Sources sought

    Sources Sought for Overhaul of CH-47 Control Assembly, Quadrant

    Due March 10, 2026 at 4:00 PM EDT. SAM.gov, notice e9ae7af39c774962bd39786a561032bc

  2. March 17, 2026

    Presolicitation, originally sources sought

    Due April 1, 2026 at 4:00 PM EDT. SAM.gov, notice 960fe77f53304d499e352d7c80b7472a

Points of contact