Sources sought, total small business set-aside
Specialized Fueling Systems Pump
W50S8L24R0004
Department of the Army, W7NA Uspfo Activity Kyang 123. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.
Response deadline
June 21, 2024 at 10:00 AM EDT
Closed 819 days ago. Posted June 6, 2024. Scheduled to archive July 6, 2024.
Description
As published on SAM.gov.
The Kentucky Air National Guard's Contingency Response Squadron is look for a vendor that can supply a Specialized Fueling Systems Pump with the following characteristics: Performance Requirements -Split-System designed modular fuel distribution built within skeleton cages -Fuel Pump/Motor Assembly weighs less than 250lbs (dry) -Multi-Fuel diesel engine -Engine can be fueled by filter system -Pull-to-start engine w/ no battery -200GPM (single port) or 100GPM (dual port) pump -Filter Assembly weighs less than 250lbs (dry) -Filter elements remove contaminates down to 1 micron and coalesce water from fuel -Two (2) 2” outlets to deliver fuel at 200GPM total throughput -Two (2) 2” inlets to receive fuel -Engine to Pump connections may be 3” -Drains on filters and connectors to defuel -All removable connectors must be quick connect -Must have sample ports after filter assembly -Flat Dark Earth finish
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 6, 2024
Sources sought
Due June 21, 2024 at 10:00 AM EDT. SAM.gov, notice aead113f5c4d4195b1494225232c9fb7
Points of contact
- Alan M Wadealan.wade.2@us.af.mil5024134439
- Jonathan Vancejonathan.vance.4@us.af.mil5024134161
Also open from this buyer
- STS TACH TIMECombined synopsis and solicitationNAICS 481219W50S8L26RA000Closes in 5 daysSep 23
- KYANG BUILDING 100 ROOF PROJECTCombined synopsis and solicitation8(a)NAICS 238160W50S8L26RA005Closes in 10 daysSep 28