Request for Information that could aid in the study of optimizing the utilization of federal pumped storage hydropower assets and new transmission paths between 2 Eastern Interconnection transmission planning regions.

SEPA_RFI_3_19_24

Department of Energy, Southeastern Power Administration. Engineering Services.

Response deadline

April 8, 2024 at 5:00 PM EDT

Closed 892 days ago. Posted March 19, 2024. Scheduled to archive April 23, 2024.

Description

As published on SAM.gov.

SOUTHEASTERN POWER ADMINISTRATION is seeking information from potential vendors that may be interested in bidding on an upcoming project pertaining to how an interested contractor could aid in the study of optimizing the utilization of federal pumped storage hydropower assets and new transmission paths between two Eastern Interconnection transmission planning regions.

Southeastern is in need of two separate studies: The first project objective consists of a study that would weigh options that would increase the transfer capability between Georgia and South Carolina, by performing a feasibility study for necessary actions which would establish a new interconnection with an investor-owned 230kV transmission line in South Carolina.

The second study should be options to derive the additional energy from pumping performing a capacity expansion study quantifying the theoretical increase in firm system capacity that can be derived from pumping. Study 1 and Study 2 are independent and may be completed in parallel.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 19, 2024

    Sources sought

    Due April 8, 2024 at 5:00 PM EDT. SAM.gov, notice a9f043f490954216a7ca70defbfd87f0

Points of contact