Skip to content
Abierto

Combined synopsis and solicitation

Heated (45?°C) Absolute Baratron® Capacitance Manometer, Power supply & Readouts, Cables, Mass Flow controller.

RFQ450899

Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables.

Response deadline

March 26, 2026 at 5:00 PM EDT

Closed 175 days ago. Posted March 23, 2026, first published March 20, 2026. Scheduled to archive March 27, 2026.

Description

As published on SAM.gov.

Heated (45 °C) Absolute Baratron® Capacitance Manometer, Power supply & Readouts, Cables, Mass Flow controller. The NUCLEAR NONPROLIFERATION DIVISION at Oak Ridge National Laboratory is in need of a Manometer and accessories per the attached Bill of Material titled Attachment C- RFQ 450899 Bill of Materials.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 20, 2026

    Combined synopsis and solicitation

    eated (45?°C) Absolute Baratron® Capacitance Manometer, Power supply & Readouts, Cables, Mass Flow controller.

    Due March 26, 2026 at 5:00 PM EDT. SAM.gov, notice 096aefad5c8d4720a30f8741feb3f6f4

  2. March 20, 2026

    Combined synopsis and solicitation

    Due March 26, 2026 at 5:00 PM EDT. SAM.gov, notice 37c55f168faf486bb2266c783e7db252

  3. March 23, 2026

    Combined synopsis and solicitation

    Due March 26, 2026 at 5:00 PM EDT. SAM.gov, notice 53f17f2a493c4599a7a343b2cfccd97f

Points of contact