Cottonwood Island Pile Dikes

PANNWD-25-P-004834

Department of the Army, W071 Endist Portland. Other Heavy and Civil Engineering Construction.

Response deadline

June 13, 2025 at 6:00 PM EDT

Closed 464 days ago. Posted May 28, 2025. Scheduled to archive June 28, 2025.

Description

As published on SAM.gov.

The design implementation approach for pile dike repairs was revised to allow for focused, cost-effective repairs to select sections of individual structures (rather than repair/enhancement of entire pile dike lengths at all the Cottonwood Island pile dikes). Repair areas are limited to sections of pile dikes that have experienced loss of all or the majority of visible piles to the extent that hydraulic function is assumed to be severely compromised.

This change in design and execution approach allows for cost effective repair of only those areas where hydraulic function has been severely compromised, easily accommodates expansion of repair areas and future repairs, and allows easy adjustment of the design based on future inspection and monitoring of function.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 28, 2025

    Sources sought

    Due June 13, 2025 at 6:00 PM EDT. SAM.gov, notice 5528a333896e45538fedfb473702053c