Sources sought, total small business set-aside
Building 35 Chiller Replacement
PANNGB26P0000036080
Department of the Army, W7M9 Uspfo Activity Ksang 184. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
June 8, 2026 at 10:00 AM EDT
Closed 102 days ago. Posted May 29, 2026. Scheduled to archive June 23, 2026.
Description
As published on SAM.gov.
This is a SOURCES SOUGHT ANNOUNCEMENT ONLY. The purpose of this sources sought is for market research to gain knowledge of potential sources for future needs including interested small business sources. This notice is for planning purposes only. All interested parties should respond. Kansas Air Nationl Guard, McConnel AFB, Kansas, will soon be soliciting for a project for Building 35 Chiller Replacement. Work shall consist of the following:
Replace existing 80 ton chiller unit with new Trane 80 ton chiller with 134A refrigerant or equivalent. The contractor will be responsible for the removal of the existing unit, including disposal of refrigerant, and installation of the replacement chiller ensuring that the new unit is properly grounded. This may require the contractor to utilize a crane to remove and replace the units. Update Direct Digital Control (DDC) system as necessary to correspond with new chiller unit.
The existing chiller is set on a concrete pad northeast of Building 35 that can be reutilized if the new unit final dimensions match the current size of the existing unit, otherwise it will be the responsibility of the contractor to expand the pads as needed. Electrical will be available and it is the contractor’s responsibility to ensure all panels / breakers are updated to meet the standards of the new chiller unit. Current power is 460V with 500 kcmil conductors.
New unit will utilize this electrical connection and voltage. Water piping is 4". New unit will utilize this size pipe. Additional information: Contractor will need to install a 4” T-valve to allow for the hook-up of a temporary chiller should the new units fail or require servicing. Should concrete pad expansion be required, contractor to use reinforced 4000 psi concrete to match thickness and elevation of existing pad.
For this requirement, the small business size standard is 19 Million for NAICS 238220. In the event small business contractors are not avaialble for adequate competition for this project, it may be advertised as unrestricted. Complete and return attached sources sought form to include bonding capability and advise on your capabilities and or past perfromance in terms of the projected requested.
Include the following email subject line "Sources Sought B35 Chillier Replacement" when emailing, to 184WG.MSG.CONTRACTING@us.af.mil. Use the same email address if you have additional questions.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 29, 2026
Sources sought
Due June 8, 2026 at 10:00 AM EDT. SAM.gov, notice a2ea6b66beb9496cb7da8531b9c1d4c0
Points of contact
- Kevin Smith184wg.msg.contracting@us.af.mil3167597591
- Joshua Kingori184WG.MSG.CONTRACTING@us.af.mil3167597590
Also open from this buyer
- 299 NOSS Squirrel ComplianceCombined synopsis and solicitationSmall businessNAICS 513210McConnell AFB, KSW50S7X26Q0023Closes in 3 daysSep 21
- B10 ChillerCombined synopsis and solicitationSmall businessNAICS 238220McConnell AFB, KSW50S7X26Q0026Closes in 4 daysSep 22
- B10 BoilerCombined synopsis and solicitationSmall businessNAICS 238220McConnell AFB, KSW50S7X26Q0027Closes in 4 daysSep 22
- 299 NOSS EoL WorkstationsCombined synopsis and solicitationSmall businessNAICS 334111McConnell AFB, KSW50S7X26Q0025Closes in 4 daysSep 22
- PDBL Mesh NetworkCombined synopsis and solicitationSmall businessNAICS 334220McConnell AFB, KSW50S7X26Q0024Closes in 4 daysSep 22