Skip to content
Abierto

Special notice, total small business set-aside

East Campus LOT 12 (Riverbank Park)

PANNAD24P0000000588

Department of the Army, W2SD Endist Baltimore. Commercial and Institutional Building Construction.

Response deadline

April 8, 2024 at 3:00 PM EDT

Closed 893 days ago. Posted March 28, 2024, first published March 25, 2024. Scheduled to archive April 23, 2024.

Description

As published on SAM.gov.

This special notice amendment adds the construction order of magnitude and project start date time frame.

This is a Prequalification of Sources Notice, in accordance with the procedures authorized by DFARS 236.272, for the East Campus Riverbank Park (Lot 12) Project. The U.S. Army Corps of Engineers (USACE) Baltimore District will solicit offers for a Firm Fixed Price Design Bid Build contract in support of the Maryland Procurement Office (MPO), Ft. Meade, MD. The East Campus Lot 12 (Riverbank Park) will be an outdoor park destination with a variety of interwoven passive and active landscape experiences.

The development shall include features such as a perimeter walking/jogging path, events lawn with restroom facilities, food truck and farmers market staging area, integrated storage area, and other similar features. The Lot 12 supporting facilities include site preparation for infrastructure features such as general site circulation, storm water management, lighting and landscaping features that are integrated within the existing East Campus.

Improvements will include new or expansion of existing utility services and distribution systems. Site preparation work will include standard clearing/grubbing, cut/fill and grading, and erosion and sediment control measures. The purpose of the park space is to support workforce wellness, increase collaboration opportunities and enhance workforce engagement. The construction order of magnitude for this effort is $5,000,000 - $10,000,000.

The estimated project start date is in anticipate in the fourth quarter of Fiscal Year 2024. The period of performance for this work is approximately 16 months. The project includes tie-in to existing campus utilities. The contractor may need to coordinate work with Baltimore Gas and Energy Utility company that would be undertaking the relocation of an existing gas line on site.

The contractor will also be required to coordinate their work with other active projects and with the personnel responsible for the stakeholder’s ongoing mission operations within the secured East Campus. The Prequalification for this acquisition will be open to all interested small business owners/contractors.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 25, 2024

    Special notice

    Due April 8, 2024 at 3:00 PM EDT. SAM.gov, notice 8d15eb44e7774b28a0d366ee4443b83a

  2. March 28, 2024

    Special notice

    Due April 8, 2024 at 3:00 PM EDT. SAM.gov, notice 4c4618f8d1804bd19d3d903ca7858407

Points of contact