Solicitation
P-1238 CONSTRUCTION OF GRID STABILITY & RESILIENCY 10 MW BATTERY ENERGY STORAGE, VARIOUS BUILDINGS AT MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
N6247322R4005
Department of the Navy, Navfacsyscom Southwest. Power and Communication Line and Related Structures Construction.
Response deadline
May 3, 2023 at 5:00 PM EDT
Closed 1234 days ago. Posted February 21, 2024, first published February 21, 2024. Scheduled to archive May 18, 2023.
Description
As published on SAM.gov.
The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 MW of battery energy storage systems (BESSs) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The BESSs shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage.
There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays.
The BESSs will be connected to the solar PV systems for clean energy charging as well as to the Project P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings at Marine Corps Air Ground Combat Center, Twentynine Palms, California Apr 15, 2022 12:03:02 AM GMT 1 installation's electric distribution system for utility power or on-site cogeneration system charging.
The BESSs will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure.
The goal for this project is to integrate BESSs into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESSs capable of parallel operation, each located in proximity to existing PV systems.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Vincent Nazzalvincent.p.nazzal.civ@us.navy.mil
Also open from this buyer
- IDIQ MACC Commercial and Institutional Building Construction, Northern and Central California and NevadaSolicitationHUBZoneNAICS 236220N6247326R0007Closes in 4 daysSep 22
- Request for Qualifications/Request for Proposals (RFQ/RFP) Pacific Coast Highway Area Reutilization Lease and Development Opportunity at Naval Weapons Station Seal Beach, CaliforniaSolicitationNAICS 531Seal Beach, CAN6247326RP00166Closes in 12 daysSep 30
- Request for Offer for RADMAC III Parcel E Remedial ActionSolicitationNAICS 562910N6247326RB009Closes in 25 daysOct 13
- P283 Electrical Infrastructure, On-Site Generation, and Microgrid Improvements at Marine Corps Air Station Miramar, San Diego, CaliforniaSources soughtNAICS 237130San Diego, CAN6247327R0006Closes in 26 daysOct 14
- Agriculture Outlease at NAS Fallon Parcels 4A04/4A07Combined synopsis and solicitationNAICS 111998Fallon, NVN62473LO11319Closes in 26 daysOct 14