Skip to content
Abierto

Solicitation

FMS; Qty: 1; NIIN: 015984368

N0038326QD093

Department of the Navy, NAVSUP Weapon Systems Support. Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing.

Response deadline

June 22, 2026 at 4:00 PM EDT

Closed 87 days ago. Posted May 21, 2026. Scheduled to archive July 30, 2026.

Description

As published on SAM.gov.

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: 310 days after receipt of asset.

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of

per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT’S ACCEPTANCE OF THE CONTRACTOR’S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.

POC:

Jillian Eder Phone:

771-229-0426 E-mail: jillian.a.eder.civ@us.navy.mil

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 21, 2026

    Solicitation

    Due June 22, 2026 at 4:00 PM EDT. SAM.gov, notice a72f7fa1670b4583b75e6811eae787b8

Points of contact