Skip to content
Abierto

Solicitation, first published as presolicitation

FMS, Qty:2,012329009

N0038326QD061

Department of the Navy, NAVSUP Weapon Systems Support. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Response deadline

March 20, 2026 at 4:00 PM EDT

Closed 182 days ago. Posted February 18, 2026, first published January 21, 2026. Scheduled to archive April 30, 2026.

Description

As published on SAM.gov.

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt Required RTAT: days after receipt of asset The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of

per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, ORSENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.

POC:

Jillian Eder Phone:

E-mail:

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 21, 2026

    Presolicitation

    FMS, QTY 2, 012329009

    Due January 23, 2026 at 4:00 PM EST. SAM.gov, notice b83c976d5fb74d70bf5773416a943b71

  2. February 18, 2026

    Solicitation

    Due March 20, 2026 at 4:00 PM EDT. SAM.gov, notice 5886236052fb4c02b75021ebae759da0

Points of contact