Skip to content
Abierto

Solicitation, first published as presolicitation

CDL RFE ASSEMBLY, IN REPAIR/MODIFICATION OF

N0038325RS080

Department of the Navy, NAVSUP Weapon Systems Support. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Awarded

L3 Technologies, Inc.

$160,000.00 obligated so far on USAspending

Description

As published on SAM.gov.

CONTACT INFORMATION|4|N763.11|WRA|215-697-4363|sarah.l.mariano2.civ@us.navy.mil | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| REPAIR DELIVERY (FIRM FIXED PRICE)|1|TBD| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|source/source|TBD|N00383|TBD|TBD|See schedule|TBD|||TBD|||||| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 Months|60 days after discovery of defect||||| Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of thefifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent Contract.

Required RTAT: 119 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X month (contractor fill in #). A throughput of 000 per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting officer.

Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contractThe parties have agreed to a price (shown on the schedule page) foreach unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements.

ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS)RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES AREEITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. \

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
FRJQGQHDX4J3
CAGE
06401
Vendor location
Salt Lake City, UT
Contract
N0038325FBQ03 under N0038325GBQ01, delivery order
Obligated
$160,000.00
Actions
2 between July 23, 2025 and July 24, 2025
Competition
Not Competed, 1 offer received
Set-aside reported
No Set Aside Used.
Described as
CDL Rfe Assembly
Match
solicitation number N0038325RS080 equals the FPDS solicitation identifier; same awarding office N00383 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 21, 2024

    Presolicitation

    Due January 5, 2025 at 11:00 PM EST. SAM.gov, notice 10a52f69c30a43638659b25bf43a714a

  2. December 6, 2024

    Solicitation

    Due January 6, 2025 at 1:00 PM EST. SAM.gov, notice aba6369c83b64c378e84f62caa09d785

Points of contact