FMS REPAIR REQUIREMENT FOR COUNTRY OF KUWAIT

N00383-25-Q-015A

Department of the Navy, NAVSUP Weapon Systems Support. Bare Printed Circuit Board Manufacturing.

Response deadline

April 10, 2025 at 4:20 PM EDT

Closed 526 days ago. Posted March 10, 2025. Scheduled to archive April 25, 2025.

Description

As published on SAM.gov.

This solicitation is for the repair of the items identified herein. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: __ days after receipt of asset.

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in#). A throughput of 0000/month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.

All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 10, 2025

    Solicitation

    Due April 10, 2025 at 4:20 PM EDT. SAM.gov, notice 701b510a3c3946aa83349091f206ac0c

Points of contact