Skip to content
Abierto

Solicitation, partial small business set-aside, first published as presolicitation

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) for Outsourcing Work from Chief of Naval Operations (CNO) Availabilities on Fast Attack Submarines

N0002425R4321

Department of the Navy, NAVSEA HQ. Ship Building and Repairing.

Response deadline

March 17, 2025 at 12:00 PM EDT

Closed 550 days ago. Posted March 14, 2025, first published December 4, 2024. Scheduled to archive March 25, 2025.

Description

As published on SAM.gov.

Multiple-award contract indefinite-delivery indefinite-quantity (MAC IDIQ) for discrete production, non-discrete production and other production work to support the Navy?s four public shipyards in accomplishing repair, maintenance, and modernization of nuclear-powered attack submarines.

The specific requirements will be defined at the delivery order level, and will encompass efforts such as preservation, structural/non-destructive testing, shipboard work, electrical services, component repair, and engineering support.

Efforts include performing drydock submarine repair, maintenance and alterations at Norfolk Naval Shipyard (NNSY), Puget Sound Naval Shipyard (PSNS), Pearl Harbor Naval Shipyard (PHNSY), and Portsmouth Naval Shipyard (PNSY), and performing the repair and restoration of select critical components. Offerors are not required to have their own drydock.

Work would be performed under delivery orders anticipated to be competed among MAC IDIQ awardees over a five-year base ordering period with three additional option years.

The Navy will include rolling admissions provisions enabling the Navy to annually announce an interim competition for the purposes of adding additional contractors to the MAC IDIQ.The Navy has categorized the requirements to be procured under the MAC IDIQ into two tiers: Critical (Lot 1) and Non-Critical (Lot 2), as defined as follows:Critical (Lot 1) requirements consist of efforts that involve critical systems.

Due to the nature of critical systems onboard the submarine and the likelihood that delays in completing work associated with these systems will have a significant impact on the overall CNO availability schedule, the Navy will require contractors to possess capability and capacity to meet technical requirements for critical systems to be eligible for Lot 1 scope.

To complete this work, awardees are expected to have the knowledge, skills, and experience necessary to complete multiple concurrent complex CNO availabilities on critical systems.

Critical systems include but are not necessarily limited to the following (all systems listed imply areas of the system and equipment requiring work certifications that are not subject to Special Emphasis Program Controls (e.g., submarine safety program (SUBSAFE), fly by wire (FBW), deep submergence systems (DSS)): Vertical Launch System (VLS) Ship control system components Torpedo tubes Bow planes Sonar dome Large Vertical Array Shipboard hydraulics systems Normal fuel oil tank and systems Lube oil systems.

The Navy intends to issue Critical (Lot 1) efforts under a full and open competition.Non-Critical (Lot 2) requirements consist of efforts that do not involve critical systems but may include systems and equipment requiring work certifications. Lot 2 scope is expected to require fewer specialized contractor capabilities, both in terms of personnel and equipment. The Navy intends to issue Non-Critical (Lot 2) efforts under a Small Business Set-Aside.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 4, 2024

    Presolicitation, originally sources sought

    SAM.gov, notice ae945677cd044c12beba51e0041f82b4

  2. December 4, 2024

    Presolicitation

    Due December 20, 2024 at 11:59 PM EST. SAM.gov, notice c158db0aac844106a4c269366eebf82a

  3. December 13, 2024

    Consolidation or bundling, originally presolicitation

    Consolidation Notification- Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) for Outsourcing Work from Chief of Naval Operations (CNO) Availabilities on Fast Attack Submarines

    SAM.gov, notice a3cdc624dcca463c8a9dc4769618ec8d

  4. December 20, 2024

    Special notice, originally presolicitation

    Due January 14, 2025 at 3:00 PM EST. SAM.gov, notice 0518f1d68ead42deb07dc314333ad46c

  5. December 20, 2024

    Special notice

    Due January 14, 2025 at 3:00 PM EST. SAM.gov, notice 999169080ad847a68d06c8d6a7ea4d87

  6. January 23, 2025

    Solicitation

    Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice 338b61925d3c448c9decff63f46efb3e

  7. January 23, 2025

    Solicitation

    Due March 10, 2025 at 12:00 PM EDT. SAM.gov, notice 7b4182d9eb9e49edb451fa5eb90ad74c

  8. February 7, 2025

    Solicitation

    Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice 536984f6bae0418dba73cb6c3ddb89d7

  9. February 21, 2025

    Solicitation

    Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice d75816ee495d45459829250e09fb2db0

  10. March 6, 2025

    Solicitation

    Due March 17, 2025 at 1:00 PM EDT. SAM.gov, notice 9b04fdddc5134331860ebe7ef6d944a6

  11. March 12, 2025

    Solicitation

    Due March 17, 2025 at 1:00 PM EDT. SAM.gov, notice 9192e6a78a19479687410e1a060b08cc

  12. March 14, 2025

    Solicitation

    Due March 17, 2025 at 12:00 PM EDT. SAM.gov, notice d6cbc57cf59d4407b328e5ce0834bf10

Points of contact