Skip to content
Abierto

Combined synopsis and solicitation, first published as sources sought

IRST Block II Full Rate Production (FRP) Fuel Tank Assembly (FTA) and Sensor Assembly Structure (SAS) Weapon Replaceable Assemblies (WRAs)

N00019-24-RFPREQ-TPM265-0511

Department of the Navy, Naval Air Systems Command. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Response deadline

April 4, 2025 at 3:00 PM EDT

Closed 532 days ago. Posted March 20, 2025, first published March 28, 2024. Scheduled to archive April 19, 2025.

Description

As published on SAM.gov.

The Naval Air Systems Command (NAVAIR) at Patuxent River, MD announces its intention to procure F/A-18E/F Infrared Search and Track (IRST) Pod Block II weapon replaceable assemblies (WRAs), specifically the Fuel Tank Assembly (FTA) and Sensor Assembly Structure (SAS), and performance of final system integration. Final integration shall ensure all IRST Block II WRAs function correctly when integrated to form a complete system.

In the case a given WRA does not function properly at the system level, potential offerors must be capable of troubleshooting and adjudicating such issues. Potential offerors may be required to design, build, or acquire special test equipment (STE) to aid in the production of IRST Block II WRAs.

The procurement is being pursued on a sole source basis under the statutory authority 10 USC 2304 (C)(l) as implemented by Federal Acquisition Regulation (FAR) 6.302-1, "Only one responsible source and no other supplies or services will satisfy agency requirements." As the contractor for the IRST system, Boeing has the manufacturing knowledge, experience, and technical data required to fulfill this requirement within the time required.

This synopsis is for informational purposes only and is not a request for competitive proposals. Responsible sources may submit a Statement of Capability and Qualifications to the Contract Specialist listed demonstrating their ability to perform the Government's requirement and shall provide proof of approved facility and personnel clearances necessary to meet the delivery schedule required within 15 days from the publication date of this announcement.

The Government will utilize the capability statements received solely to confirm the sole source acquisition approach or to reconsider a competitive procurement. A determination not to compete this requirement is solely within the discretion of the United States Government. For small business or subcontracting opportunities, contact Boeing at (314) 233-1599.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 28, 2024

    Sources sought

    Due April 12, 2024 at 3:00 PM EDT. SAM.gov, notice 2ae46e5a40e94c85ae5f279ecd2637e7

  2. May 9, 2024

    Presolicitation

    IRST Block II Full Rate Production (FRP) – Fuel Tank Assembly (FTA) Sensor Assembly Structure(SAS), and Final System Integration

    Due May 24, 2024 at 3:00 PM EDT. SAM.gov, notice a48f32d4759b4cb6bed2761257a88b7d

  3. January 22, 2025

    Combined synopsis and solicitation, originally sources sought

    Due February 6, 2025 at 3:00 PM EST. SAM.gov, notice 799a427ed0f744baab941ab576c6bcbe

  4. March 20, 2025

    Combined synopsis and solicitation

    Due April 4, 2025 at 3:00 PM EDT. SAM.gov, notice 59d6107f5e414aeea459ea33ede8c1bb

Points of contact