Solicitation
Fermilab - Daycare Center Crawl Space Supports
ISD-357300-RYK
Department of Energy, Fermilab - DOE Contractor. Structural Steel and Precast Concrete Contractors.
Response deadline
October 11, 2024 at 4:00 PM EDT
Closed 708 days ago. Posted September 27, 2024. Scheduled to archive October 26, 2024.
Description
As published on SAM.gov.
1.0 INTRODUCTION AND BACKGROUND Fermilab is requesting a proposal for removal and replacement of crawl space jack posts, demolition of existing concrete footings, and installation of new footings at the Daycare Center building. The existing jack posts are in various stages of deterioration and require replacement. Additionally, the existing footings are undersized and new footings are required. 2.0 SCOPE Provide all work as shown on : ? Drawing set for ISD Project 10-2-153 ?
Specification Sections: o 010010 GENERAL REQUIREMENTS o 013100 ENVIRONMENT, SAFETY, AND HEALTH REQUIREMENTS o 013300 SUBMITTALS o 014100 QUALITY REQUIREMENTS The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications.
All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications. The Subcontractor’s scope of work is not limited to the general work outline described herein. The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and/or specifications.
The description and quantities listed are general in nature and are only intended to describe the range and complexity of this scope of work. The description and quantities provided below are not to be used as the basis for establishing a cost proposal. Specific quantities and definitions of the scope of work for providing a proposal shall be based solely on estimates developed by the Offer from the drawings, specifications, and the information obtained from examining of the project site.
Confined space training is required for work in the crawl spaces. 3.0 DELIVERABLES The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and specifications. 4.0 QUALITY ASSURANCE A Fermilab Construction Coordinator will be assigned to this project. See Specification Section 010010, GENERAL REQUIREMENTS. The Subcontractor is responsible for all activities necessary to manage, control, and document that work complies with the Subcontract documents. The Subcontractor’s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on- and off-site by his/her organization,
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 27, 2024
Solicitation
Due October 11, 2024 at 4:00 PM EDT. SAM.gov, notice db31cc280ffe4d9d9d749c6131071bd8
Points of contact
- Richard Konanrkonan@fnal.gov6308402835
Also open from this buyer
- RFP For PORTABLE PHASED ARRAY ULTRASONIC FLAW DETECTOR FOR NDT INSPECTIONCombined synopsis and solicitationNAICS 541380RFP386950Closes in 2 daysSep 21
- DUNE Residual Gas Analyzer StationSolicitationNAICS 339999Lead, SDRFP_387087RLPCloses in 2 daysSep 21
- Fire Sprinkler Repair_XGal_IB2A_Lab1_MI50SolicitationSmall businessNAICS 238220Batavia, ILISD-381401-ROCloses in 4 daysSep 23
- DC BlocksSolicitationNAICS 332710Batavia, ILRFP385586Closes in 6 daysSep 25
- Fermilab- CUB Boiler 1 PC Replacement-382968-DGSolicitationNAICS 238220Illinois382968-DGCloses in 6 daysSep 25