Skip to content
Abierto

Solicitation

A/E Electrification Study

ISD-349281-SCM

Department of Energy, Fermilab - DOE Contractor. Engineering Services.

Response deadline

March 8, 2024 at 6:00 PM EST

Closed 923 days ago. Posted February 26, 2024, first published February 12, 2024. Scheduled to archive March 23, 2024.

Description

As published on SAM.gov.

FRA is seeking a qualified firm to conduct a planning level study for the laboratory campus of Fermilab in Batavia, aimed at transitioning its energy infrastructure to fully electric systems. The study will focus on analyzing the feasibility, challenges, and opportunities associated with electrifying the campus, including the replacement of natural gas systems. The study will also evaluate the impact of introducing EV infrastructure.

The overall goal is to optimize energy consumption, enhance energy efficiency, promote energy conservation, and achieve a sustainable, net-zero emissions operation. Please see the attached RFP for more details. AMENDMENT 01 (02/19/2024) The purpose of this amendment is to upload the Terms and Conditions (see attached doc). No other changes were made. AMENDMENT 02 (02/26/2024) The purpose of this modification is to:

1. Remove all language requesting price proposals. This is a request for qualifications.

2. Answer all RFI’s received. See attached Amendment 02 file.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 12, 2024

    Solicitation

    Due March 8, 2024 at 6:00 PM EST. SAM.gov, notice 5d52f271b7054616a856e0106b2d0971

  2. February 19, 2024

    Solicitation

    Due March 8, 2024 at 6:00 PM EST. SAM.gov, notice 3d43e6bff62a49f9bf979beb1cd6b3f9

  3. February 26, 2024

    Solicitation

    Due March 8, 2024 at 6:00 PM EST. SAM.gov, notice f450c6b49ea04d05b7c09a61e6aeb2ca

Points of contact