Skip to content
Abierto

Sources sought

Fire Hydrant Replacement

INL-26-025

Department of Energy, Battelle Energy Alliance–doe CNTR.

Response deadline

March 28, 2026 at 1:59 AM EDT

Closed 173 days ago. Posted February 25, 2026, first published February 25, 2026. Scheduled to archive March 11, 2026.

Description

As published on SAM.gov.

INTRODUCTION Battelle Energy Alliance, LLC (BEA) Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors to provide fire hydrant replacement services at the Specific Manufacturing Capability (SMC) facility. This initiative supports BEA’s commitment to maintaining reliable fire protection systems and ensuring compliance with safety standards. BACKGROUND The SMC facility requires replacement of aging fire hydrants to maintain operational readiness and meet fire safety requirements. The scope of work may include the following:

Removal and disposal of existing fire hydrants. Installation of new hydrants and associated piping connections. Verification of water supply and pressure requirements. Compliance with applicable safety, environmental, and fire protection standards. Testing and commissioning to ensure proper functionality. INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation.

INL is operated under a management and operating contract with the Department of Energy and as such, the Davis-Bacon Act applies for contracts in excess of $2,000 for the construction, alteration, or repair (including painting and decorating) of buildings or works at INL. Construction work at the laboratory Site covered under the Davis-Bacon Act is additionally subject to the INL Site Stabilization Agreement (SSA).

These Site areas include all areas within the 890-square mile boundary, including the Material and Fuels Complex, Central Facilities Area, Advanced Test Reactor, Radioactive Waste Management Complex, and Specific Manufacturing Capability. The agreement is between signatory contractors and labor unions performing such work. Information regarding the INL Site Stabilization Agreement is available from the Site Labor Coordinator at (208) 524-4404 or at lance@sitelabor.org.

Construction work performed at Idaho Falls facilities is not subject to these agreements. PROCESS This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration. SUBMITTAL REQUIREMENTS Interested vendors should submit an Expression of Interest that includes the following:

Company name and point of contact Description of relevant fire hydrant replacement capabilities and experience NAICS codes and business size classification Any existing DOE or federal contracting experience (if applicable) Deadline for submission:

March 27, 2026 Submit to:

Chase.Egbert@inl.gov Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation. PROPRIETARY INFORMATION Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 25, 2026

    Sources sought

    Due March 28, 2026 at 1:59 AM EDT. SAM.gov, notice 0224f4f044d54cc8a52d62855caac7d9

  2. February 25, 2026

    Sources sought

    Due March 28, 2026 at 1:59 AM EDT. SAM.gov, notice 5fe8cf5b4b834f3d94048df3f67bd1be

Points of contact