Special notice
Industry Day for FY25 MILCON P-693 Command Center, Andersen Air Force Base, Guam
Industry_Day_at_Guam_for_FY25_P-693
Department of the Navy, Navfacsyscom Pacific. Commercial and Institutional Building Construction.
Response deadline
October 21, 2024 at 8:00 PM EDT
Closed 696 days ago. Posted October 1, 2024, first published July 19, 2024. Scheduled to archive November 5, 2024.
Description
As published on SAM.gov.
The Naval Facilities Engineering Systems Command (NAVFAC) Pacific will have an Industry Day for FY25 MILCON Project P-693 Command Center, Andersen AFB, Guam.
P-693: The project constructs a Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment. The CC will include functional areas to accommodate personnel, computing equipment, user interfaces, and communications needed for planning, controlling, and directing mission activities.
The power generation facility will provide power via the switchgear facility for the command center and associated infrastructure with fuel from the storage facility consisting of above ground fuel tanks, fuel off-loading infrastructure, and associated containment. The CC facility and power generation facility will be designed for Risk Category IV to meet site specific ground motion and seismic requirements to include base isolation. Construction scope and methods that will be required as part of this project include, but are not limited to:
Demolition of existing housing units and the associated mitigation/disposal of asbestos, lead contaminated materials, and pesticide contaminated soil Civil site work, including grading, paving, and retaining walls Concrete construction meeting the requirements of ICC-500 Storm Shelter and including coordination of cast-in-place, tilt-up, and precast elements 150 foot Galvanized Steel Antenna Tower and associated foundation Seismic Isolation Bearings requiring a specialized installation procedure and building erection sequence involving extensive construction shoring and bracing Protection measures for nonstructural components, including flex loops for piping & conduit to accommodate seismic movement Security infrastructure includes real property features to support the installation of Security System Level (SSL)-C and Integrated Electronic Security System (IESS), site security measures, entry control, and material procurement & inspection requirements Facilities will be designed to provide cyber security engineering and validation Control System Integration requiring the aggregation of multiple control systems, including Building Controls, Fuel System Controls, and Utility Controls Complex schedule due to the nature of the concrete & isolated foundation construction, long lead times for major equipment such as Tier 2 Emergency Generators and Mechanical equipment, and multiple Joint Occupancy Date (JOD) milestones in the construction schedule to accommodate work of other contractors outfitting systems, installing equipment, and integrating controls Electrical (lighting and distribution), fiber optic and telecommunications, fire protection, sanitary sewer, and storm drainage P-693 Project Cost Range: $250M-$500M Anticipated Project Award:
Q4 FY25 When: August 22, 2024 (Part 1) & August 23, 2024 (Part 2) Part 1 Agenda (tentative and subject to change):
0930-1000 ChST:
Check in 1000–1010 ChST:
Opening Remarks, Pledge of Allegiance 1010–1030 ChST:
Overview of Military Program 1030–1130 ChST:
Overview of P-693 Command Center Project 1130–1200 ChST: Sign-up for Individual Contractor Breakout Sessions for 23 August 2024 Where: The Industry Day will be hosted at the Holiday Resort, Guam.
Who: Contractors (general and specialist) with appropriate experience with new construction of administrative, office, or communications facilities; construction of secure spaces; new construction of essential facilities in moderate to high seismic areas.
What: Part 1 will occur during Society of American Military Engineers (SAME)’s August Monthly Meeting on August 22, 2024. NAVFAC Pacific will present P-693 Command Center for contractors to learn about the project, ask questions, and provide feedback, in a group, regarding the proposed Military Construction project located at Andersen Air Force Base, Guam. NAVFAC will not answer any question considered sensitive (e.g. procurement info, CUI, etc.) at any time during the event. This event is open to the public.
Information presented during Part 1 will be made available to those who are not able to attend. Part 2 will occur on August 23, 2024. NAVFAC Pacific will be holding 16 in-person Individual Contractor Breakout Sessions. Sessions will be limited to 20 minutes.
Participation in Part 1 is not required to participate in Part 2. Registration: Contractors interested in attending Part 1 need to pay and register with SAME at https://www.paypal.com/donate/?hosted_button_id=XXNHQMEUP3B2L by August 20, 2024. Part 1 walk-in registration is $100 for members and non-members.
Registration for Part 1 does not automatically register individuals to attend Part 2. Contractors interested in Part 2 (regardless of Part 1 attendance) are invited to provide company name, physical address, Company POC, attendee email addresses, and telephone number to Dayna Matsumura (dayna.n.matsumura.civ@us.navy.mil), Contract Specialist, no later than August 1, 2024. Due to time and space constraints, registration will close upon reaching maximum capacity.
Online Comment Submission: Contractors are invited to submit questions and/or comments in advance of the Industry Day in writing in WORD format via electronic mail to Dayna Matsumura at dayna.n.matsumura.civ@us.navy.mil no later than August 10, 2024, 2:00 p.m., Hawaii Standard Time. NAVFAC will not answer any question considered sensitive (e.g., procurement info, CUI, etc). Any suggestions made may be incorporated in the solicitation. Please do not share any proprietary information. All questions and responses will be posted publicly via the SAM.gov website. NAVFAC will not answer any question deemed sensitive (e.g., procurement info, CUI, etc).
Contractor Breakout Sessions: Contractors are invited to one-on-one sessions with NAVFAC Pacific to provide feedback on P-693. The Government will not respond to questions regarding P-693 during the sessions. Please note that NAVFAC Pacific’s Designer of Record, Jacobs Black & Veatch JV, will also be present during these sessions. Sessions will be conducted informally and all discussions will remain private (not posted to public).
Post-Industry Day Documentation: Pursuant to the Industry Day held on August 22, 2024, the following documentation will be posted to SAM.gov. Industry Day Contractor Attendee List Industry Day Presentation Brief Industry Day Question and Answers Disclaimer: Information contained herein is not a guarantee of the Government’s course of action concerning current or future requirements. The information presented reflects current Government intentions; but is subject to change.
Published solicitations, if issued, are the only documents that should be relied upon in determining the Government’s actual requirements. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. No reimbursement will be made for any costs associated with attending or providing information in response to this announcement. No telephone calls will be accepted requesting a bid package or solicitation because there is no bid package or solicitation available. Any references to the Society of American Military Engineers (SAME) does not constitute or imply DoD/DON/NAVFAC endorsement of SAME.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 19, 2024
Special notice
Due August 10, 2024 at 8:00 PM EDT. SAM.gov, notice e4d29a6f0fd549078ecbc9295ac35a41
July 29, 2024
Special notice
Due August 10, 2024 at 8:00 PM EDT. SAM.gov, notice 5f46bf17533b44cc9c3b00e9d1d0da40
October 1, 2024
Special notice
Due October 21, 2024 at 8:00 PM EDT. SAM.gov, notice 321c7f8e84144b79aadd1940cba6e75e
October 1, 2024
Special notice
Due October 21, 2024 at 8:00 PM EDT. SAM.gov, notice ccbcf38ee1724df89020c7d4c71a202c
Points of contact
- Dayna Matsumuradayna.n.matsumura.civ@us.navy.mil8084713694
- Erin Hoeerin.y.hoe.civ@us.navy.mil8084745356
Also open from this buyer
- Add Fuel Hydrant at Pumphouse 3 and 4, US NAVSUPPACT Andersen AFB, GuamSources soughtNAICS 237120GuamN62742DBBP722Closes in 6 daysSep 24
- RFP N62742-26-R-3601 Enterprise Construction Management Support Multiple Award Contract (ECMS MAC)SolicitationNAICS 541330N6274226R3601Closes in 11 daysSep 29
- WON 1665555, FY24 AJJY183012 (P-012), PDI: NORTH AIRCRAFT PARKING RAMP, ANDERSEN AIR FORCE BASE, GUAMSolicitationNAICS 237310GuamN62742-26-R-1300Closes in 21 daysOct 9