Bomb Release Unit (BRU-57) Smart Bomb Rack

FA855424RB003

Department of the Air Force, FA8554 AFSC Ebuk. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Awarded

L3harris Technologies, Inc.

$0.00 obligated so far on USAspending

Description

As published on SAM.gov.

This solicitation will be used to establish a Firm Fixed Price Requirements type five-year Indefinite Delivery Indefinite Quantity (IDIQ) for 1 (one) year Basic ordering period and four (4) one (1) year ordering periods for Depot Level Teardown, Evaluation and Repair (as needed) of the Bomb Release Unit (BRU-57) Smart Bomb Rack sole source to L3 Harris (CAGE 82340). The BRU-57/A (BRU- Bomb Release Unit) Smart Bomb Rack used on the F-16 Fighter.

The BRU-57 is a MIL-STD-1760 capable, multiple-carriage, vertical-ejection BRU. Two USAF standard BRU-46/A bomb ejector racks are utilized on the BRU-57/A. The BRU-57/A is used to provide side-by-side carriage and release of two 14-inch suspension stores. The BRU-57/A accommodates the MIL-STD-1760 mission stores, allowing for communication between the aircraft Stores Management System (SMS) and the weapon/store.

These mission stores include, but are not limited to, Joint Standoff Weapon (JSOW) and the Wind Corrected Munitions Dispenser (WCMD). Perform depot-level repair of the BRU-57 Smart Rack. Depot-level repair/upgrade encompasses the teardown, evaluation, repair, rebuild, and test of components as specified in the Performance Work Statement (PWS.) The bomb rack and components listed below shall be repaired as required in accordance with original manufacturer's methods and procedures.

The Contractor shall tear down and assess the level of repair within 15 working days of receipt of repairable items. The Contractor must control their inventory such that no unit exceeds a work in progress time of 45 working days for 90% of the units. The remaining 10% must be accomplished within a period not to exceed 60 working days. Whenever possible, parts should be stocked or locally manufactured to facilitate timely repair. Required delivery of repaired item is 60 working days after receipt. Contractor shall meet the required delivery at least 90% of the time Sole Source to EDO (82340).

BRU 57, NSN 1095-01-483-3872 GG, P/N MT57M1501-1 Height:

7.1 Width:

29" Length:

69.8 Weight: 250; The BRU 57 is a MIL-STD-1760 capable, multiple carriage, vertical ejection bomb rack unit (BRU).

MATERIAL: CRES 17-4PH, 2004 ALUMINUM SUPER PLASTIC ALLOY;

ITEM FUNCTION: Carries and releases stores on the F-16 aircraft; Basic Ordering Period 10 ea.; Ordering Periods I-IV 10 ea.

High Band Width Assembly NSN:

1095-01-523-5767, P/N: MT57M1165-1;

Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 5.0";

MATERIAL: RTV, metal fasteners, EMI gasketing ITEM FUNCTION: The HBA provides signal routing of the two high bandwidth and low bandwidth signals; Basic Ordering Period 5 ea.; Ordering Periods I-IV 5 ea.

Power Supply Assembly NSN:

6130-01-523-3338GG, P/N: MT57M1177-1;

Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 10.0"; MATERIAL Printed circuit board, metal fasteners, locking compound, interfacial sealant;

ITEM FUNCTION: controls power regulation for the rack; Basic Ordering Period 5 ea.; Ordering Periods I-IV 5 ea.

Power Supply Assembly NSN:

6130-01-523-3339GG, P/N: MT57E1210-1;

Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 10.0"; MATERIAL metal, wire;

ITEM FUNCTION: Regulates and provide power for the rack; Basic Ordering Period 15 ea.; Ordering Periods I-IV 15 ea.

Micro Control Assembly NSN:

1095-01-523-3337GG, P/N: MT57M1153-2 and MT57M1153-5;

Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 5.0"; MATERIAL Printed Circuit Board, metal fasteners, EMI gasketing, RTV;

ITEM FUNCTION: Allow signal transfer throughout the rack; Basic Ordering Period 20 ea.; Ordering Periods I-IV 20 ea.

Bus Buffer Assembly NSN:

1095-01-523-5773GG, P/N: MT57E1212-1 and MT57E1212-2;

Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 5.0"; MATERIAL metal, metal fasteners;

ITEM FUNCTION: Allow signal transfer throughout the rack; Basic Ordering Period 15 ea.; Ordering Periods I-IV 15 ea.

Circuit Card Assembly NSN:

5998-01-522-7603GG, P/N: MT57M1190-2 and MT57M1190-3;

Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 2.0"; MATERIAL Circuit car, RTV, EMI gasketing, metal fasteners;

ITEM FUNCTION: Transfer and control signals, power, and other circuitry. thru out the rack; Basic Ordering Period 15 ea.; Ordering Periods I-IV 15 ea.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
CN7PNYLZLNV3
CAGE
82340
Vendor location
Amityville, NY
Contract
FA855426DB001
Obligated
$0.00, potential $5,900,179
Actions
1 between June 3, 2026 and June 3, 2026
Competition
Not Available for Competition, 1 offer received
Set-aside reported
No Set Aside Used.
Described as
Basic Year with 4 Additional ONE-YEAR Ordering Periods for Bru-57s, Circuit Card Assemblies, Micro Control Assemblies, Power Supplies, High Bandwidth Assemblies, Buffer Bus Assemblies, and Data.
Match
solicitation number FA855424RB003 equals the FPDS solicitation identifier; same awarding office FA8554 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 21, 2024

    Solicitation

    Due September 5, 2024 at 3:00 PM EDT. SAM.gov, notice 725f944448d14f5a8e9c934c96851b40

  2. May 21, 2024

    Solicitation

    Due September 5, 2024 at 3:00 PM EDT. SAM.gov, notice 89ddf0a0df3c4e0992fa99f3daba3d20

  3. June 12, 2024

    Solicitation

    Due August 15, 2024 at 3:30 PM EDT. SAM.gov, notice 6160036d5a9f4ce69aeab05998b61139

Points of contact