Skip to content
Abierto

Solicitation

A-10 AFT Cowlings LH (5 YR IDIQ)

FA8212-23-R-0007

Department of the Air Force, FA8212 AFSC Olh Pzaba. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Response deadline

March 12, 2024 at 5:00 PM EDT

Closed 919 days ago. Posted January 16, 2024, first published January 11, 2024. Scheduled to archive March 27, 2024.

Description

As published on SAM.gov.

16JAN2024: Solicitation is canceled due to the mission change received by the President approving the 2024 National Defense Authorization Act (NDAA).

11JAN2024: Attached is Q&A Round 5. 19DEC2023: Attached is Q&A Round 4 and Amendment 0004. 13DEC2023:

Attached Q&A Round 3. 11DEC2023: Attached Q&A Round 2_Clarification on 5% SDB Applies to Individual Plans (not Master Plans)_Next RFP amendment will include this clarification.

8DEC2023: Attached Q&A Round 1_08DEC2023.

4DEC2023: Attached LPTA NOT Authorized Clarification_4DEC2023.pdf.

30NOV2023: Attached RFP Amendment 003 with updated SECTION L&M.

30NOV2023: The Site Visit Q and A has been updated to require utilizing the master tooling for the production of the First Article.

27NOV2023: The Site Visit Q and A from the 14NOV2023 AMARG site visit has been updated.

21NOV2023: The Site Visit Q and A from the 14 NOV 2023 AMARG site visit has been attached.

17NOV2023: A new version of the AMARG Site Visit Attendess List v2 that identifies the small business manufacturers has been uploaded.

16NOV2023: Attached is the site visit attendee list for the site visit on 14Nov2023. In addition, Site Visit Master Tooling Pictures are also attached. Please note the Government is not liable for any inadequacies in the pictures.

19OCT2023:

Amendment 0002 has been posted. RFP has not been extended.

Amendment 0002 provides drawings of the Tail Cone Master Tooling. In addition, the modeling group has been revising and verifying the 3D models listed in the EDL. These models will be validated and released by contract award. The current models provided have minor errors related to geometry but do not affect the contractor’s ability to provide an accurate quote.

16OCT2023: Please review Amendment 0001 in its entirety and please email the PCO if you have any questions. The solicitation has been amended to add Master tooling as GFP. In addition, The USAF has scheduled a site visit to allow vendors to physically inspect the Master tooling at the AMARG on Tuesday November 14 2023 starting at 0830 local time.

The details are in Amendment 0001. Please let me know if your firm is bidding on the RH and LH Aft Cowlings and if your firm is attending the site visit no later than (NLT) Friday October 27, 2023. This will be the only site visit to inspect the Master tooling. Please note, the drawings/specs for the casting house for the RH Aft Cowling and LH Aft Cowling are nearly the same. The drawings for the casting house for the LH Aft Cowling have been provided in the solicitation for bidding purposes. The drawings for the RH Aft Cowlings for the casting house will be provided by contract award.

14SEP2023: Solicitation is posted for 120 Days. Please note, the models for the casting house are listed in the SECTION J of the solicitation however, they could not be attached to this notice (Attach_24_160D413024-11_D-ADAPTER CASTING.stp and Attach_25_160D413029-11_C-ADAPTER_FITTING.stp). Please e-mail the PCO for access to the drawings posted in this notice and the rest of the TDP listed in SECTION J as ZIP FILES.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 11, 2024

    Solicitation

    Due March 12, 2024 at 5:00 PM EDT. SAM.gov, notice 73634623b4f749b082b1ca73b9bc597c

  2. January 16, 2024

    Solicitation

    Due March 12, 2024 at 5:00 PM EDT. SAM.gov, notice cda1b984b5454296b4e5407f2158b23c

Points of contact