Description

As published on SAM.gov.

The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to remove all equipment associated with the Monaco system in fire department vehicles. The Monaco systems previously installed are end of life and causing electrical and battery issues in vehicles leading to unreliable operation. The system is no longer in use and must be demobilized in order to ensure reliability of emergency response vehicle fleet.

Remove Monaco equipment including but not limited to; Wiring, fuse blocks, UPS devices, Antennas, Antenna Cables, Battery Chargers, and all associated brackets from ten (10) fire department response vehicles. All existing vehicle wiring, emergency light/sirens, shoreline connections and vehicle battery chargers should remain and be fully functional with no bare wiring at completion of removal.

Remove Monaco equipment including but not limited to; Wiring, fuse blocks, UPS devices, Antennas, Antenna Cables, Battery Chargers, and all associated brackets from Chief 2(Ram 1500) and SCAT11(Ford F450) fire department response vehicles. One battery charger with associated wiring and shoreline auto eject connection should remain or be remounted and wired to charge the vehicle starting battery.

All existing vehicle wiring, emergency light/sirens, shoreline connections and vehicle battery chargers should remain and be fully functional with no bare wiring at completion of removal. Vendor/contractor shall validate all components of the system performance after installation All removal and installation work must be completed within 60 days from award.

A warranty, to include all software, hardware components, installation, and labor of the proposed solution, will cover not less than one year from the date of LRAFB final acceptance.

Site Visit: An organized site visit is scheduled for 23 May 2024 at 1:30 PM CST. This will be the only site visit conducted. Participants are to meet at the front gate visitor center of Little Rock AFB @ 1:00 PM to allow time to obtain escort passes and accountability. Vendors MUST RSVP to the POCs listed no later than 17 May 2024 at 4:00 PM CST on who will be attending the site visits. Little Rock AFB is not an open base and you must have a valid ID to access the base.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 17, 2024

    Combined synopsis and solicitation

    Due April 26, 2024 at 5:00 PM EDT. SAM.gov, notice ec410075e93d4cd1a5c160bc9e4b4795

  2. May 7, 2024

    Combined synopsis and solicitation

    Due June 6, 2024 at 5:00 PM EDT. SAM.gov, notice fbbed1e7ab25437d9af425337cd1528e

Points of contact