B348 CDC Chiller

FA302225R0002

Department of the Air Force, FA3022 14 Cons Lgca. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

June 10, 2025 at 4:00 PM EDT

Closed 464 days ago. Posted June 4, 2025, first published May 1, 2025. Scheduled to archive June 25, 2025.

Description

As published on SAM.gov.

Amendment 02: RFI answers are posted in the SAM.gov 1. Compatibility of Existing Low-Pressure Ductwork with New VAV System: The SOW specifies a new VAV system tied into existing ductwork at the mechanical room wall. However, the existing system is low-pressure, while standard VAV designs typically require medium-pressure ductwork. Although RFI #13 confirms the ductwork is to remain, this does not address how the performance discrepancy will be mitigated.

Could you please confirm whether the Government intends to retain the low-pressure distribution system and, if so, whether the VAV system should be adapted to operate within those limitations? The Government intends to retain the existing low pressure ductwork. The air handling system needs to be adapted to handle this situation.

2. Heating Water Supply to VAV Terminal Units: The VAV boxes are noted to include reheat coils, yet the scope does not mention extending the heating water loop to serve them. Without local reheating capability, space temperature control would be limited, as supply temperature modulation at the AHU cannot independently serve multiple zones. We respectfully ask whether hot water piping should be extended to each new VAV terminal unit or if another reheat method is expected.

Extend heating water loop to serve all VAV boxes. 3. Clarification on the “Main Activity Room” Inclusion: The 2020 record drawings identify a “Main Activity Room” not referenced in the solicitation drawings or AHU coverage notes. While RFI #19 states that the HVAC footprint has not changed, this does not confirm whether this space is to be conditioned under the current project. Could you please confirm whether the Main Activity Room is included in the scope of work for the new HVAC system? The main activity room is part of the youth center annex and is served by a separate HVAC system that is not covered in this project.

Amendment 01: RFI answers are posted in the SAM.gov attachments. The purpose of this amendment is to:

1. Extend solicitation due date from 02 June 25 to 10 June 25.

2. Edit section M to adjust past performance threshold from $1,000,000.00 to $500,000.00.

3. All other terms and conditions remain unchanged.

The Contractor must provide all plant, labor, equipment, transportation, and tools required to replace, modify, and upgrade mechanical equipment of B348. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.

The work required in this project includes, but is not limited to, replacement of the chiller, air handler, piping, insulation, pumps, and related electrical components. A full recommissioning and testing, adjusting, and balancing of the HVAC system will also be required under this contract.

Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on Monday, 12 May 2025 at 2:30 PM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 2:00 PM CST on 07 May 2025. To register, please email the POC requesting the DoD Safe drop-off link to securely upload the Entry Authorization Listing (EAL) document. If you do not contact the POC by 2:00 PM CST on 07 May 2025, you will not be able to attend the site visit.

Identification: All attendees must bring a valid photo ID.

Vehicle Requirements: If driving, please ensure the driver has driver's license, vehicle registration, and proof of insurance.

Additional Info: All RFIs must be submitted NLT 3:00 PM CST, on 15 May 2025. IAW FAR 36.204(e) - The range of magnitude for this procurement is between $500,000 and $1,000,000.

NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 1, 2025

    Solicitation, originally sources sought

    Due June 2, 2025 at 4:00 PM EDT. SAM.gov, notice 60230f05b3b846079e2590e77046a119

  2. May 6, 2025

    Solicitation

    Due June 2, 2025 at 4:00 PM EDT. SAM.gov, notice bc81ef0d94cc4b0d904ae5f8b2cc30cf

  3. May 6, 2025

    Solicitation

    Due June 2, 2025 at 4:00 PM EDT. SAM.gov, notice c32712d5260c48dca73f11dc829e1541

  4. May 29, 2025

    Solicitation

    Due June 10, 2025 at 4:00 PM EDT. SAM.gov, notice ce3b2e5a8f7a44a3a6c3d50d309ee825

  5. June 4, 2025

    Solicitation

    Due June 10, 2025 at 4:00 PM EDT. SAM.gov, notice 8f0e6d900c2a4d9e9d865f4ee94e1675

Points of contact