Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Commercial Fan Purchase and Install

FA301625Q6172

Department of the Air Force, FA3016 502 Cons CL. Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing.

Response deadline

August 25, 2025 at 1:00 PM EDT

Closed 389 days ago. Posted August 22, 2025, first published August 15, 2025. Scheduled to archive September 9, 2025.

Description

As published on SAM.gov.

AMENDMENT 00001: The purpose of this amendment is to post questions and answers. Please acknowledge receipt of the Amendment MFR and send it with your revised quote. All other documents, terms, and conditions remain unchanged.

(See Attachment 3. Amendment MFR FA301625Q6172 signed and Attachment 4. Questions and Answers MFR FA301625Q6172) The 502nd Contracting Squadron is looking for interested and capable vendors who can provide and install commercial industrial fans at 1701 Kenly Ave at Kelly Airfield on Lackland AFB (see attachments for details).

This is a combined synopsis/solicitation for a commodity prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate Request for Quote (RFQ) will not be issued. The solicitation number is FA301625Q6172 and is issued as a Request for Quote (RFQ).

This combined synopsis/solicitation incorporates provisions and clauses are those in effect through Federal Acquisition Circular 2025-05 and DFARS change notice 01/17/2025. This purchase is being solicited as 100% Small Business set-aside. This NAICS code is 333413 and the size standard is 500 employees.

Description of Services The scope of this service involves the supply and installation of two commercial-grade overhead Fan's (e.g.,Big Ass Fans), one 20' and one 12', along with controllers and mounting brackets inside the hangar to include all appurtenances such as the electrical branch wiring to exsisting panel box and controller to exsisting electrical services.

The objectives is to improve air circulation within the hangar, enhance temperature control to create a more comfortable working environment and ensure the ceiling fan is installed safely, and securely. All work shall be performed by licensed contractors in accordance with all relevant building codes. The Contractor shall conduct a site visit prior to any work to assess exact site condition(s). General Information Please refer to all attachments for important details.

Download all attachments, fill out the RFQ, and send VIA email NLT 25th August 2025. *Failure to acknowledge all Amendments will result in your quote not being considered for award.*

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 15, 2025

    Combined synopsis and solicitation

    Due August 25, 2025 at 1:00 PM EDT. SAM.gov, notice 46c298efe66046b28eca982b5e26497a

  2. August 22, 2025

    Combined synopsis and solicitation

    Due August 25, 2025 at 1:00 PM EDT. SAM.gov, notice 7ceea1b2e02c4071a44bf7ea3acd0ff0

Points of contact