Skip to content
Abierto

Combined synopsis and solicitation

NASA GRC TE Connectivity Optimus System

80TECH24Q0042

National Aeronautics and Space Administration, NASA IT Procurement Office. Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals.

Response deadline

August 9, 2024 at 5:00 PM EDT

Closed 769 days ago. Posted August 6, 2024. Scheduled to archive August 24, 2024.

Description

As published on SAM.gov.

NASA Glenn Research Center (GRC) has a requirement to purchase Measurement Specialties TE Connectivity Optimus System for use at the 10x10 Supersonic Wind Tunnel (SWT). The 10x10 SWT at NASA GRC is standardized to using TE Connectivity/ Measurement Specialties products for pressure measurement. The system currently in use is the predecessor of the Optimus Pressure Measurement System and uses the same interface to connect with the NASA data system. The interface between the Optimus system and NASA’s data system has been developed over the last decade and is well understood, being in use at various other facilities at NASA GRC.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 6, 2024

    Combined synopsis and solicitation

    Due August 9, 2024 at 5:00 PM EDT. SAM.gov, notice 37d22730ad244ebf8f9f685857959b0e

Points of contact