Solicitation, total small business set-aside
Clean, Flush, and Inspect Coast Guard Cutter OBION Sewage and Gray Water Systems
70Z02925QNEWO021B
US Coast Guard, Base New Orleans. Ship Building and Repairing.
Response deadline
January 31, 2025 at 3:00 PM EST
Closed 595 days ago. Posted January 23, 2025. Scheduled to archive February 15, 2025.
Description
As published on SAM.gov.
The United States Coast Guard Base New Orleans, is flooking for a qualified source to clean and flush the Cutter OBION's sewage piping system, clean and flush the Gray/Grey Water Piping systems, and clean and inspect the sewage holding tanks in accordance with the Statement of Work (SOW, attached) and provided SFLC Standard Specifications and Drawings. All relevant drawings are provided. Please note, this requirement will have specific Quality Assurance and inspection points throughout the requirement.
All inspections will be conducted with an appointed USCG representative. All attached drawings and standard specifications are applicable. A site visit is encouraged. Vendors are required to be registered and current in sam.gov with a UEI. Federal Acquisition Regulations Clauses and Wage Rates are included and applicable. Please fill out blocks 17a thru 31c on attached Standard Form 1449 (SF-1449) if you will be submitting a quote. All applicable paperwork is attached to this solicitation. The requirement will be awarded to lowest price.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 23, 2025
Solicitation
Due January 31, 2025 at 3:00 PM EST. SAM.gov, notice 866780e1ef8047678bd6c2f061082697
Points of contact
- Robert Henson IIrobert.c.henson@uscg.mil5042534513
- James TepenJames.A.Tepen@uscg.mil3145658893
Also open from this buyer
- Locate & Repair a Water Main Leak at USCG Cutter Chena Moorings in Hickman, KYCombined synopsis and solicitationSmall businessNAICS 237110Hickman, KY70Z02926QNEWO04Closes in 3 daysSep 21