Skip to content
Abierto

Sources sought

MODE SELECT BEACON SYSTEM (MODE S) DATA PROCESSING SYSTEM (DPS) BLOWER, LOWEST REPLACEABLE UNIT (LRU) REPLACEMENT

6973GH-24-R-DPS

Federal Aviation Administration, 6973GH Franchise Acquisition SVCS. Printed Circuit Assembly (Electronic Assembly) Manufacturing.

Response deadline

January 22, 2024 at 5:00 PM EST

Closed 969 days ago. Posted January 8, 2024. Scheduled to archive February 6, 2024.

Description

As published on SAM.gov.

The FAA has a requirement to provide a Form, Fit, and Functional (FFF) replacement of the Data Processing System (DPS) Blower within the Mode Select Beacon System (Mode S) Sensor. This Request for Information (RFI) is a request for capabilities to meet the specific requirements under Requirement Specifications and Statement of Work (SOW). All technologies for the Data Processing System (DPS) Blower within the Mode Select Beacon System (Mode S) Sensor are being evaluated. For more information please review ALL attachements within this request for information

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 8, 2024

    Sources sought

    Due January 22, 2024 at 5:00 PM EST. SAM.gov, notice 6ff8d50cfced4c62b8742bdfebf325ea

Points of contact