Skip to content
Abierto

Sources sought

WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

690567-24-SS-0017

Federal Highway Administration, 690567 Western Federal Lands Div. Highway, Street, and Bridge Construction.

Response deadline

June 25, 2024 at 5:00 PM EDT

Closed 814 days ago. Posted May 22, 2024. Scheduled to archive July 10, 2024.

Description

As published on SAM.gov.

Sources Sought for WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR See Sources Sought Notice under attachments for instructions on responding. The proposed contract action is for a firm-fixed-priced construction contract. This project will enhance the safety and public access to the Willapa National Wildlife Refuge through the repair and widening of the deteriorated roadway. The primary objective of the proposed project is roadway embankment, paving, and striping.

The project location is 2 miles east of Long Beach, Washington in Pacific County. The total project length is 0.15 miles. Contract award is anticipated by Spring 2025 with construction during Summer-Fall 2025. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million.

Estimated Price Range: Between $700,000 and $2,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 22, 2024

    Sources sought

    Due June 25, 2024 at 5:00 PM EDT. SAM.gov, notice b44d7141424a44528e2296f67b848b75

Points of contact