Estimating the Cost of a Manufacturing Plant for LFP-Based Lithium-Ion Cells

5-B191-P-00160-00

Department of Energy, Argonne Natl Lab - DOE Contractor. Engineering Services.

Response deadline

May 19, 2025 at 1:00 PM EDT

Closed 487 days ago. Posted May 23, 2025, first published April 29, 2025. Scheduled to archive June 3, 2025.

Description

As published on SAM.gov.

The objective of this requirement for a study is to estimate the design and cost of setting up and operating a large- scale plant in the United States to produce LIB using LFP and LFMP cathode active materials. Estimates for three plant sizes should be provided for 5, 25, and 50 GWh per year capacity plants. This work is expected to provide Argonne with a design of the physical and chemical processing steps necessary in the production of cells using LFP and LMFP cathode materials.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 29, 2025

    Solicitation

    Due May 12, 2025 at 6:00 PM EDT. SAM.gov, notice e1fb4e3148584afb9904daabef498dd3

  2. May 8, 2025

    Solicitation

    Due May 19, 2025 at 1:00 PM EDT. SAM.gov, notice 5f0205581d184b489d538fc224af54ac

  3. May 23, 2025

    Solicitation

    Due May 19, 2025 at 1:00 PM EDT. SAM.gov, notice e6dff77b51744c68942e98c334cdff52