Special notice
DCSC-25-RFP-015 HCMC Courthouse Mechanical Room 1000 heating upgrades
District of Columbia Courts, District of Columbia Courts. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
August 26, 2025 at 3:00 PM EDT
Closed 387 days ago. Posted July 29, 2025. Scheduled to archive September 10, 2025.
Description
As published on SAM.gov.
The District of Columbia Courts (hereafter referred to as the “Courts”) is seeking a qualified contractor to provide construction services as specified in this solicitation for the HCMC Heating Upgrades located at the H. Carl Moultrie Courthouse, at 500 Indiana Avenue, NW.
The project scope associated with this task order involves the conversion of the existing GSA provided steamed water system to a new on-site gas boiler supplied heating system. located in extension to the HCMC Mechanical Room 1000. The scope of work includes phased and optioned construction of the following equipment: Extension of Mechncal Room(s), Shaft Installation (Parking Level up to the Roof), Exhaust Fans, Heating Pump(s), Boilers, and associated Piping and Controls.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 29, 2025
Special notice
Due August 26, 2025 at 3:00 PM EDT. SAM.gov, notice 4bcab6caf7d74f85b7ea38a026510ded
Points of contact
- Kenneth EvansKenneth.Evans@dccsystem.gov2028798776