Special notice
Plating Shop Renovation Industry Day
Department of the Army, W075 Endist Sacramento. Industrial Building Construction.
Response deadline
October 22, 2025 at 3:00 PM EDT
Closed 330 days ago. Posted November 3, 2025. Scheduled to archive November 22, 2025.
Description
As published on SAM.gov.
Project Title:
Plating Shop Renovation – Hill AFB, Utah Sponsor:
U.S. Air Force Executing Agency: U.S. Army Corps of Engineers, Sacramento District (SPK)
Project Type:
Renovation and New Construction Delivery Method: Design-Bid-Build (DBB)
Contract Type: Firm-Fixed Price (FFP), Single Award Task Order Contract (SATOC)
Ordering Period: 1,825 calendar days (5 years)
Bonding: Required at the task order level for awarded/active work only Location: Buildings 505 & 507, Hill AFB, Utah Estimated Magnitude of Construction: $100,000,000 – $250,000,000 Purpose of Industry Day The U.S. Army Corps of Engineers, Sacramento District – Utah Satellite Office is conducting an Industry Day to provide interested Offerors with a clear understanding of the Government’s requirements and project timelines. The event will: Present upcoming project requirements and anticipated milestones.
Facilitate Q&A sessions to address technical, schedule, and procurement questions. Promote networking between industry representatives and the USACE Hill Team. Provide a tour of the Plating Shop.
Key USACE Staff Available: Project Manager, Technical Lead, Discipline Design Leads, Environmental Leads, and Contracting Officers. Project Overview The Plating Shop Renovation project will modernize and expand existing facilities located in Building 505 (B505) and Building 507 (B507) at Hill AFB, Utah, ensuring continued depot-level maintenance capability for multiple aircraft platforms.
The renovation addresses compliance with OSHA and environmental standards, enhances safety and ergonomics, improves energy efficiency, reduces maintenance costs, and provides a robust, modernized facility to ensure reliable aircraft part finishing in support of Air Force readiness. The project includes both the comprehensive renovation of 20,000 square feet of existing shop space and the construction of a new 2,800-square-foot Pre-Engineered Metal Building (PEMB) to accommodate expanded operations. Renovation – Building 505/507 (20,000 SF)
Structural Upgrades: Reinforce basement slabs, footings, and CMU walls. Replace structural platforms, columns, and grating for plating tanks. Modify roof structure to support overhead cranes.
Mechanical & Process Systems: Replace HVAC and ventilation systems for chemical processes and fume exhaust. Refurbish chemical-resistant coatings on floors, walls, and ceilings.
Electrical & Controls: Upgrade panelboards, busways, circuits, instrumentation, and lighting to support automated, traceable plating operations.
Fire & Life Safety: Install updated fire suppression systems, emergency eyewash/shower stations, and life safety signage.
Key Plating Processes: Electroless Nickel Cadmium Plating Chrome and High Velocity Oxygen Fuel (HVOF) Strip Chrome Plating Anodize / Alodine (Type II & III) Zinc Nickel Plating Nickel Sulfamate Plating Phosphate / Temper Etch / Passivate Aluminum Conversion Coat Titanium Pickle Fluorescent Penetrant Inspection (FPI) Aqueous Degrease / Future Lines New Construction – Pre-Engineered Metal Building (PEMB) (2,800 SF) Constructed adjacent to Building 505 to accommodate ovens that extend beyond the building footprint.
Design Features: Insulated steel panels, standing seam metal roof, polyisocyanurate insulation, snow guards.
Basement & Platforms: Cast-in-place basement, equipment platforms, steel stairs, service utility routing.
Integration: Structural opening and expansion joint between B505 and PEMB for seamless operational flow.
Ordering Period & Phased Construction Approach Ordering Period: 1,825 calendar days (5 years) to accommodate phased construction, complex equipment installation, testing, and commissioning.
Task Orders: Each phase executed under a separate pre-priced task order with its own Notice-To-Proceed (NTP).
Phased Construction Schedule:
Phase 1:
Demolition: 'A' tank line (B507), ovens (B505)
Installation: Type II Anodize (B507); Chrome, Type III Anodize, Phosphate/Passivate (B505)
Phase 2:
Demolition: Chrome, Anodize, Phosphate lines Installation: Cadmium, Zinc Nickel, Temper Etch, Nickel, Electroless Nickel Phase 3:
Demolition: Cadmium, Iridate, Zinc Nickel, Temper Etch, Nickel lines Installation: Chrome Strip, FPI, Degrease, Future lines Phase 4:
Demolition: Chrome and FPI lines Installation: New Chrome tank line Each task order includes labor, equipment, supervision, and materials and is issued within the 5-year ordering period. Occupancy of Premises Work occurs in active, secure facilities. Contractors must maintain security, protect Government property, provide dust enclosures, and coordinate with ongoing operations.
Industry Day Details Date:
Friday, November 07, 2025 Time: 0900 – 1100 MDT (Briefing); 1300 – 1430 MDT (Site Visit – Building 505)
Briefing Location: USACE Utah Layton Satellite Office, 523 S. Heritage Park Blvd, Suite 1, Layton, UT 84041 Site Visit Location: Building 505, Hill Air Force Base, Utah RSVP Instructions: Submit by 1200 PDT on 22 October 2025 with: Full Name Company Name Email Address Email RSVP to:
Melita S. Doyle – melita.s.doyle@usace.army.mil Amelia K. Bryant – amelia.k.bryant@usace.army.mil
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 3, 2025
Special notice
Due October 22, 2025 at 3:00 PM EDT. SAM.gov, notice 46fdf371dfcb4bf89b23ffa6ef8349bb
Points of contact
- Melita Doylemelita.s.doyle@usace.army.mil
- Amelia K. Bryantamelia.k.bryant@usace.army.mil
Also open from this buyer
- IIS USFS Tanbark Hazard Tree RemovalSolicitationSmall businessNAICS 561730Riverside, CAW9123826QA035Closes in 5 daysSep 22
- $625M USACE SPD Vertical AE Design MATOCSolicitationNAICS 541330W9123826RA008Closes in 11 daysSep 28
- USACE SPK Construction - Natomas PP5, Sacramento, CASolicitationNAICS 237990Sacramento, CAW9123826BA012Closes in 12 daysSep 29
- Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CASolicitationNAICS 238210Tracy, CAW9123826RA002Closes in 18 daysOct 5
- USACE SPK MOTCO Facilities and Utilities Maintenance Services - Concord, CaliforniaSources sought8(a)NAICS 561210W9123826X1CDKCloses in 21 daysOct 8