Award notice, service-disabled veteran-owned small business set-aside, first published as presolicitation
Building 149 and 150 Demolition 552-26-201
36C25026B0027
Department of Veterans Affairs, 250-Network Contract Office 10. Site Preparation Contractors.
Awarded
$186,238.00 obligated so far on USAspending
Description
As published on SAM.gov with the solicitation of March 10, 2026.
Question: Page 9 of 74 solicitation reference Additional Considerations for Building 150 Par F.. Provide a detailed description of all hazardous materials located in the structure and provide it to the COR Is testing required to identify all hazardous materials, and who is responsible for identifying any/all of the materials that will require testing to be designated (or not) as hazardous?
Answer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.
Question: Page 5 of 74 solicitation reference Utility Removal and Termination Par(s) A, B, C, D Removal and safe termination of (steam, condensate, electrical systems, water supply) in each building at their source Will the various utilities be terminated in the respective buildings 149 and/or 150 or another building, and can the VA provide as-built drawings for the buildings that the utilities will be terminated in?
Answer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been copped by maintenance shops. Refer to 006 Steam Distribution Plan in this solicitation.
Question: Page 7 of 74 solicitation, reference Hazardous Material Handling Par D., The contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of unknown type and quantity buried under the roof debris. Shall the contractor assume potential hazards to be asbestos, lead paint/pipes, mercury, PCBs, mold, silica dust, creosote, refrigerants, etc.?
Answer: Due to the extent of the structural failure, all materials shall be considered to be hazardous.
Question: Page 9 of 74 solicitation, reference Additional Considerations for Building 149 Par G., Provide a detailed description of all hazardous materials located in the structure Shall the contractor provide the detailed description following testing? and will a contract modification be issued if unforeseen and unreported hazardous materials are found that require special handling and disposal?
Answer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.
Question: Solicitation and Specifications, many references are made to asbestos, has there been a hazardous survey completed for the buildings scheduled for demolition and can the VA post the hazardous survey via amendment?
Answer: Due to safety concerns, no survey was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal Question: Solicitation and Specifications, many references are made to asbestos, has any testing been performed to determine if asbestos actually exists in the buildings scheduled for demolition or is the contractor to assume the building does contain asbestos? Is the contractor to assume the asbestos is friable or non-friable?
Answer: Due to safety concerns, no testing was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type.
The VA needs to account for what hazardous materials are located in the demo site for disposal Question: During demolition of building 149, can the contractor assume the corridor connecting buildings 305 and 409 will be closed to normal hospital foot traffic, a containment with ramps and floor protection would be constructed isolating the corridor door(s) leading to the parking lot between buildings 305 and 409, and finally, can the contractor stage dumpsters in that parking area?
Answer: The corridor connecting buildings 305 and 409 shall be closed to normal hospital foot traffic. Coordination for setting dumpsters shall be coordinated with the COR.
Question: Can you tell us How tall are walkways are, so we know which crane to use? Will the contractor need to relandscape the area after the demo is complete on build 149?
Answer: The roof ridge line is estimated to be around 20' above grade. This is not an exact measurement. Yes. The contractor shall be responsible for areas that are effected by the construction.
Question: In reference to Section 01 00 00, can connecting corridors between buildings 409 and 305 be closed off for demolition and removal of Building 149? Can the parking lots, located outside the corridors, be closed off for Crane and dumpster staging for demolition of Building 149?
Answer: Connecting corridor between will require closer in order to remove debris. Sections of the parking lot can be closed off for the use of equipment and dumpster. However, the loading dock will need to remain accessible to maintain shipping and receiving operations.
Question: In reference to Section 01 57 19, can hoses be run thru building or hallway for dust suppression for demolition of Building 149?
Answer: No hoses will be permitted to run through buildings. A hose running across the corridor at the access doors will be acceptable. No hose connection will be permittable within the corridor to prevent damages caused by possible leakages. Hoses running through the corridor shall be removed as required to secure corridor doors.
Question: In reference to Section 33 63 00, what are the requirements for Steam line abandonment?
Answer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been capped by the maintenance shops.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Koala Roofing LLC
- UEI
- Z16BG9LAXMN9
- CAGE
- 9YEK0
- Vendor location
- Edenton, NC
- Contract
- 36C25026C0099, definitive contract
- Obligated
- $186,238.00
- Actions
- 1 between May 4, 2026 and May 4, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 12 offers received
- Set-aside reported
- Service Disabled Veteran Owned Small Business SET-ASIDE
- Described as
- Building 149 and 150 Demolition - 552-26-201
- Match
- award number 36C25026C0099 equals the contract number; same awarding office 36C250 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 2, 2026
Presolicitation
Due March 19, 2026 at 10:00 AM EDT. SAM.gov, notice 45c2140ebc404f27a4d649bc67e1d082
February 11, 2026
Solicitation, originally presolicitation
Due March 13, 2026 at 10:00 AM EDT. SAM.gov, notice 9183b45576b0437eb7067822a4f8da6c
February 13, 2026
Solicitation
Due March 19, 2026 at 10:00 AM EDT. SAM.gov, notice 56f4346ff5d44d26b352711cd29b8af1
February 23, 2026
Solicitation
Due March 19, 2026 at 10:00 AM EDT. SAM.gov, notice c785320269c145fc8039b086dfe6a454
March 10, 2026
Solicitation
Due March 19, 2026 at 10:00 AM EDT. SAM.gov, notice 103ef9e64f28491ca91d771b6a5399f4
May 5, 2026
Award notice
Awarded to Koala Roofing LLC Edenton 27932 NCL for $186,238. SAM.gov, notice 619749e0591b4b0f8ecd21e052744d01
Points of contact
- Julie Stout, Contracting Officerjulie.stout@va.gov317-988-1519
Also open from this buyer
- Smoke and Fire Damper InspectionCombined synopsis and solicitationSDVOSBNAICS 541350Dayton, OH36C25026Q0974Closes todaySep 18
- Intensive Outpatient Program (IOP) Beds to be located in Summit County, OHSolicitationNAICS 62322036C25027Q0001Closes todaySep 18
- Sterile Processing Water Quality Chillicothe VA Medical CenterCombined synopsis and solicitationSDVOSBNAICS 221310Chillicothe, OH36C25026Q0430Closes todaySep 18
- 541-26-3-250-0496 - UltraSAFE Automatic Formalin Dispensing System This is a a Small Business Only Set-AsideCombined synopsis and solicitationSmall businessNAICS 333914Cleveland, OH36C25026Q1047Closes in 3 daysSep 21
- 3D Scanning Water SystemSolicitationNAICS 33451736C25026Q1043Closes in 3 daysSep 21