Special notice
FY26: REPAIR MEDICAL GAS LEAK
36C24726Q08680001
Department of Veterans Affairs, 247-Network Contract Office 7. Facilities Support Services.
Response deadline
September 23, 2026 at 1:00 PM EDT
Closed in 5 days. Posted September 16, 2026. Scheduled to archive September 30, 2026.
Description
As published on SAM.gov.
RFI QUESTIONS AND QUESTIONS:
1st Vendor: I respectfully request any available photographs of the existing header currently installed. Attached If photographs are not available, we would greatly appreciate any identifying information you may have for the existing header, including the manufacturer, model number, and part number. This information will assist us in accurately evaluating the existing conditions and preparing our quotation accordingly.
2nd Vendor: 1. Is there a proposed site visit? Not currently planned 2. Can you provide the most recent annual medical gas inspection report? Attached 3. Can you provide pictures of the backup oxygen header? Attached 4. Is the backup oxygen header outside at the bulk oxygen site or an in-building emergency reserve? In-building reserve 5. Can you provide pictures of the valves that are being replaced? Attached.. Although some of the missing zone valves either could not be located or do not exist.
6. Can you provide sizes of the valves being replaced? Attached.. Although some of the missing zone valves either could not be located or do not exist. 7. Can you confirm you are referring to zone valve boxes (in hallways, operable from a standing position) or are you referring to service/in-line valves (in ceilings, mechanical rooms, etc.)? Unknown, some of the missing zone valves either could not be located or do not exist.
8. Can you clarify the zone valve issue; are there zone valves missing that need to be added, or are we replacing leaking zone valves? SOW says, missing zone valves , but it seems unlikely that the facility is missing that many valves. Zone valves have been in the code for decades. Some of the missing zone valves either could not be located or do not exist. 9. SOW (B) states 26 zone valves; is it 26 different locations or 26 total valves.
Ex: Oxygen, Medical Air, Vacuum for ICU. In your count, are you counting that as 3 valves even though it s in a single zone valve box . See attached report for details. 10. Can you identify the areas where the new zone valves will be installed? OR s, ICU, PACU, Radiology, etc. The area they are in impacts the ICRA procedures and hours of operation. Patient exam rooms. ICRA procedures will likely be required.
3rd Vendor: Please let me know if we can schedule a site visit so we can gain a better understanding of the scope of work and provide a more accurate quote. Not currently planned 4th Vendor: Will there be a site visit made available to verify location of Medical Gas leak and 26 valves to be replaced?  If so, when? Not currently planned
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 16, 2026
Special notice
Due September 23, 2026 at 1:00 PM EDT. SAM.gov, notice 04e28503983d48869daad2e72807f295
Points of contact
- Terri Hudson, Contract SpecialistTerri.Hudson@va.gov205-933-8101 x3338
Also open from this buyer
- VISN 7 Virtual Pharmacy ServicesCombined synopsis and solicitationSDVOSBNAICS 621399Tuscaloosa, AL36C24726Q0605Closes in 3 daysSep 21
- Amendment 0001 - 36C24726Q0772 - Project 557-23-103 | Replace Building 2 and Building 4 Generators | ConstructionCombined synopsis and solicitationSDVOSBNAICS 236220Dublin, GA36C24726Q07720001Closes in 3 daysSep 21
- Bayer MEDRAD Injector PM and Repair Services Base plus 2Combined synopsis and solicitationSmall businessNAICS 811210Montgomery, AL36C24727Q0030Closes in 4 daysSep 22
- UPS Preventative Maintenance ServicesCombined synopsis and solicitationSDVOSB sole sourceNAICS 335999Dublin, GA36C24727Q0028Closes in 4 daysSep 22
- INSTALL LEAD BASED LINERS / 544 - Columbia SC - VA Medical CenterPresolicitationSDVOSBNAICS 23839036C24726Q0910Closes in 6 daysSep 24