Solicitation, local area set-aside
VNET 2nd ISP Circuit 07/01/2025-06/30/2026
19M05525P0401
Department of State, U.S. Embassy Rabat. Wireless Telecommunications Carriers (except Satellite).
Response deadline
May 21, 2025 at 10:00 AM EDT
Closed 484 days ago. Posted May 6, 2025. Scheduled to archive June 5, 2025.
Description
As published on SAM.gov.
The Embassy of the United States of America in Rabat invites you to submit your quotes for the below mentioned services. The purpose of this document is to provide Posts with the standard NT specifications and requirements when ordering the internet circuits from the local ISP (Internet Service Provider). This internet circuit shall be high-end, professional grade service that differs from the residential, dial up service.
NT requires dedicated (not shared or bundled) Internet Bandwidth, 24/7, “always-on” with unlimited usage. Fiber optic, terrestrial connectivity is preferred. The local ISP access circuit to the Post must meet the following specifications/requirements for connectivity. A /28 subnet static Public IP addresses for VPN equipment, network mask, and default gateway IP address.
ISP interface connectors: LC fiber connector (MM-multimode) – Gigabit interface ISP availability: "Always on" ISP connection: IPs must NOT repeat and NOT use Network Address Translation (NAT). ISP must permit all IP protocols (including but not limited to ICMP, UDP, TCP, and IPSEC) to transit without filters or proxies. Unfiltered access to the Internet is required without ISP firewall blocking or stateful inspection. ISP must permit installation of Customer VPN encryption devices on circuit.
ISP must permit ping and trace route traffic from 169.252.0.0/16 and 169.253.0.0/16 to the ISP connection (LC fiber Gigabit MM router interface which terminates Customer VPN encryption device). High quality performance, the following parameters in a vendor’s Service Level Agreement (SLA) should be used: Packet Loss <=.5% Availability of 99.9%. Period of performance: from 07/01/2025 to 06/30/2026 Speed required: 80 Mbps
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 6, 2025
Solicitation
Due May 21, 2025 at 10:00 AM EDT. SAM.gov, notice 9ba81daadaff45efa14b369f49ca9104
Points of contact
- Fouad Mouaatakidmouaatakidf@state.gov212537637653
- Rabat GSO ContractsRabatGSOContracts@state.gov