Combined synopsis and solicitation
US Embassy Brazzaville Chancery Cooling System Test and Balance
19CF2025Q0019
Department of State, U.S. Embassy Brazzaville. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
September 15, 2025 at 7:00 AM EDT
Closed 367 days ago. Posted September 12, 2025, first published August 27, 2025. Scheduled to archive September 30, 2025.
Description
As published on SAM.gov.
The US Embassy in Brazzaville requires services of the contractor to perform a comprehensive Test and Balance (TAB) for the cooling system, specifically the air handling units (AHUs) serving the chancery building. Below are additional specifications with regards to the system Number of Fan Coil Units: 4 Number of Balancing Dampers (Air) :
80 Number of Balancing Valves:
6 Number of Chillers:
3 Number of Primary Pumps:
2 Number of Secondary Pumps:
2 Number of Air Handling Units:
6 Number of Fire Dampers: 5 Composition of Chilled water system 3 Air-cooled chillers One chiller of the three is equipped with heat exchanger and glycol One supply line to the building One return line from the building. One bypass line with a with bypass valve. Chilled water flow SP= 6 liters per second. The total number of dampers in the air distribution network : 80 Provision of images, schematics, or requirement specification documents
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Chilango GlhaneChilangoGE@state.gov242066122012
- Charlem ISSOMBOIssombonce@state.gov242066122094