FCC Hazelton, Fire Suppressions System Inspection and/or Maintenance
15B12124PR000229
Federal Prison System / Bureau of Prisons, Usp Hazelton. Building Inspection Services.
Response deadline
March 28, 2024 at 1:00 PM EDT
Closed 904 days ago. Posted March 16, 2024. Scheduled to archive April 12, 2024.
Description
As published on SAM.gov.
FY24 Annual Fire Suppression Inspection - Complex wide Sprinkler system PE 86170 Fire Suppression - Annual Wet Pipe (Sprinkler), Standpipes & Hoses (HAZ) FBOP Fire Suppression – Annual Wet Pipe (Sprinkler), Standpipes & Hoses (HAZ Complex Wide) Inspections Procedures/Requirements FBOP Fire Suppression – Annual Wet Pipe (Sprinkler), Standpipes & Hoses (HAZ Complex Wide) The Annual Fire Suppression Inspection, Testing, and Maintenance shall be conducted in compliance with the provisions contained within NFPA 25 (latest edition).
The following items, at a minimum, are to be included in the annual fire suppression inspection/test. This is a convenience list only. For more detailed methods and frequencies, refer to NFPA 25. Inspection/test by a qualified contractor. The procurement documentation shall specify the qualified contractor performs the inspection per ASME/ANSI (latest edition) or local requirements, provides a written report documenting the items inspected, and identify all noted deficiencies prior to final payment. Sprinklers Wet/Dry Spare Sprinklers Pipe and fittings. Hanger/seismic bracing Fire Pumps/Fire Pump Systems
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 16, 2024
Sources sought
Due March 28, 2024 at 1:00 PM EDT. SAM.gov, notice 6b4175281afd406c854b92867cac193a
Points of contact
- Kelly Brownk1roberts@bop.gov3043795156
- FCC Hazelton ProcurementHAX-ProcurementProp-S@bop.gov