Skip to content
Abierto

Sources sought

FCC Hazelton, Fire Suppressions System Inspection and/or Maintenance

15B12124PR000229

Federal Prison System / Bureau of Prisons, Usp Hazelton. Building Inspection Services.

Response deadline

March 28, 2024 at 1:00 PM EDT

Closed 904 days ago. Posted March 16, 2024. Scheduled to archive April 12, 2024.

Description

As published on SAM.gov.

FY24 Annual Fire Suppression Inspection - Complex wide Sprinkler system PE 86170 Fire Suppression - Annual Wet Pipe (Sprinkler), Standpipes & Hoses (HAZ) FBOP Fire Suppression – Annual Wet Pipe (Sprinkler), Standpipes & Hoses (HAZ Complex Wide) Inspections Procedures/Requirements FBOP Fire Suppression – Annual Wet Pipe (Sprinkler), Standpipes & Hoses (HAZ Complex Wide) The Annual Fire Suppression Inspection, Testing, and Maintenance shall be conducted in compliance with the provisions contained within NFPA 25 (latest edition).

The following items, at a minimum, are to be included in the annual fire suppression inspection/test. This is a convenience list only. For more detailed methods and frequencies, refer to NFPA 25. Inspection/test by a qualified contractor. The procurement documentation shall specify the qualified contractor performs the inspection per ASME/ANSI (latest edition) or local requirements, provides a written report documenting the items inspected, and identify all noted deficiencies prior to final payment. Sprinklers Wet/Dry Spare Sprinklers Pipe and fittings. Hanger/seismic bracing Fire Pumps/Fire Pump Systems

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 16, 2024

    Sources sought

    Due March 28, 2024 at 1:00 PM EDT. SAM.gov, notice 6b4175281afd406c854b92867cac193a

Points of contact