Justification
Special Notice of Intent to Sole Source: Emergency repair and replace of seawater motors/pumps
1333MF24P0053
National Oceanic and Atmospheric Administration, Department of Commerce NOAA. Fluid Power Pump and Motor Manufacturing.
Awarded
$118,140.00 obligated so far on USAspending, March 27, 2024, contract 1333MF24P0053
Description
As published on SAM.gov.
NOAA's National Marine Fisheries Service (NMFS), Southwest Fisheries Science Center (SWFSC) Santa Cruz, Fisheries Ecology Division, intends to negotiate, on a sole source basis, under authority of FAR 13.106-1(b)(1), with DXP Enterprises, Inc. This notice is in accordance with FAR 6.305(b).
The sole source determination is based on the National Oceanic and Atmospheric Administration (NOAA) requirement and market research to repair and replace various motors and water pumps.
Background/Overview: The Santa Cruz Laboratory (SCL) is a fisheries research facility of the National Marine Fisheries Service (NMFS), which is part of the National Oceanic and Atmospheric Administration (NOAA); Department of Commerce. The SCL site is approximately 1000 feet from the coastal surf zone, which is considered harsh environment for building structures and their systems. The facility is a two-story, 56,000 square foot building which serves approximately 150 researchers and support staff.
Their work consists of laboratory and experimental research that is designed to manage and conserve marine fisheries resources including marine, coastal, and estuarine habitats. Activities associated with this effort include conferences, meetings, chemical and biological experiments, aquarium “wet” studies, videotape studies, and computer-based modeling and statistical studies.
Scope of Work The Southwest Fisheries Science Center, Santa Cruz Laboratory requires three-phase pump repairs, and several VFD replacements to the boiler water system, condenser water system and chilled water system. The contractor shall furnish nine (9) VFDs and install four (4) of them. The contractor shall also replace six (6) motors to support three-phase pumps. Services shall be complete in all respects and include labor, tools, materials, equipment.
Subcontracts, and all support for engineering and engineering plan drawings including any and all work required for this Scope of Work. Tasks The contractor shall complete the following tasks.
Task 1: Pump (P-1) 5 hp boiler pumps.
Room 152 Lock out Tag out pump (P-1) Close Isolation valves Disconnect electrical and remove motors Furnish and install new motor with TEFC Sealed Motor Bearings No Maintenance (5hp) Connect electrical for pump, check rotation, couple pump to motor and replace stainless shims Laser align newly installed motor Test and ensure pumps are operational and aligned Start up by certified technician Parts supply: Furnish one new motor with TEFC Sealed Motor Bearings No Maintenance (5hp) Parts only.
Furnish two (2) fuses for service disconnect switches P1. Parts only Task 2: Pump (P-2) 5 hp boiler pumps.
Room 152 Lock out Tag out pump (P-2) Close Isolation valves Disconnect electrical and remove motors Furnish and install new motor with TEFC Sealed Motor Bearings No Maintenance (5hp) Connect electrical for pump, check rotation, couple pump to motor and replace stainless shims Laser align newly installed motor Test and ensure pumps are operational and aligned Start up by certified technician Parts supply: Furnish one (1) new motor with TEFC Sealed Motor Bearings No Maintenance (5hp) Parts only. Furnish two (2) fuses for service disconnect switches P2. Parts only.
Task 3: Pump (P-4) 5 hp Chilled water pump. Room 169 Lock out Tag out pump (P-4) Close Isolation valves Disconnect electrical and remove motors Furnish and install new motor with TEFC Sealed Motor Bearings No Maintenance 5hp Connect electrical for pump, check rotation, couple pump to motor and replace stainless shims Wire the electrical switch to operate in auto/hand and off positions. VFD controls will run in auto.
Pumps to run in manual operations in hand setting on switch Laser align newly installed motor Test and ensure pumps are operational and aligned Install mounting hardware for VFD Furnish and install new ABB x HP NEMA 3 with stainless steel enclosure boxes. Replace existing VFD Furnish and install new ABB x HP NEMA 3 with stainless steel enclosure boxes.
Replace existing VFD Building automation controls Supply and run low voltage wiring to support building automation monitoring and controls Program, control and update graphics on the customers Siemens Desigo Operating system Points to be monitored and alarmed should include HTZ, pump pressure and on/off status. Demonstrate alarm and monitoring when completed. Start up by certified technician. Parts supply: Furnish one (1) ABB 5 hp VFD (parts only). Furnish and install new motor with TEFC Sealed Motor Bearings No Maintenance 5hp. Parts only. Furnish two (2) fuses for service disconnect switches P4. Parts only.
Task 4: Pump (P-6) 10 hp Condenser pump. Room 166 Lock out Tag out pump (P-6) Close Isolation valves Disconnect electrical and remove motors Furnish and install new motor with TEFC Sealed Motor Bearings No Maintenance 10hp Connect electrical for pump, check rotation, couple pump to motor and replace stainless shims Laser align newly installed motor Test and ensure pumps are operational and aligned Install mounting hardware for VFD Furnish and install all conduit and wiring needed for new VFD installation.
Furnish and install new ABB 10 HP NEMA 3 with stainless steel enclosure boxes (New addition). No existing unit in place. Building automation controls Supply and run low voltage wiring to support building automation monitoring and controls Graphics to be monitored and alarmed should include HTZ, pump pressure and on/off status. Demonstrate alarm and monitoring when completed. Start up by certified technician. Parts supply: Furnish one (1) new motor with TEFC Sealed Motor Bearings No Maintenance 10hp. Parts only. Furnish one (1) new ABB 10 HP NEMA 3. Parts only. Furnish two (2) fuses for service disconnect switches P6. Parts only.
Task 5: Pump (P-7) 10 hp Condenser pump. Room 166 Lock out Tag out pump (P-6) Close Isolation valves Disconnect electrical and remove motors Furnish and install new motor with TEFC Sealed Motor Bearings No Maintenance 10hp Connect electrical for pump, check rotation, couple pump to motor and replace stainless shims Laser align newly installed motor Test and ensure pumps are operational and aligned Install mounting hardware for VFD Furnish and install all conduit and wiring needed for new VFD installation.
Furnish and install new ABB 10 HP NEMA 3 with stainless steel enclosure boxes (New addition). No existing unit in place. Building automation controls Supply and run low voltage wiring to support building automation monitoring and controls Graphics to be monitored and alarmed should include HTZ, pump pressure and on/off status. Demonstrate alarm and monitoring when completed. Start up by certified technician. Parts supply: Furnish one (1) new motor with TEFC Sealed Motor Bearings No Maintenance 10hp. Parts only. Furnish one (1) new ABB 10 HP NEMA 3. Parts only. Furnish two (2) fuses for service disconnect switches P7. Parts only.
Task 6: Pump (P-8) 5 hp Chilled water pump. Room 169 Lock out Tag out pump (P-4) Close Isolation valves Disconnect electrical and remove motors Furnish and install new motor with TEFC Sealed Motor Bearings No Maintenance 5hp Connect electrical for pump, check rotation, couple pump to motor and replace stainless shims Wire the electrical switch to operate in auto/hand and off positions. VFD controls will run in auto. Pumps to run in manual operations in hand setting on switch.
Laser align newly installed motor Test and ensure pumps are operational and aligned Install mounting hardware for VFD Furnish and install new ABB x HP NEMA 3 with stainless steel enclosure boxes. Replace existing VFD. Building automation controls Supply and run low voltage wiring to support building automation monitoring and controls Program, control and update graphics on the customers Siemens Designo Operating system Graphics to be monitored and alarmed should include HTZ, pump pressure and on/off status.
Demonstrate alarm and monitoring when completed. Start up by certified technician. Parts supply: Furnish one (1) ABB 5 hp VFD (parts only) Furnish one (1) new motor with TEFC Sealed Motor Bearings No Maintenance 5hp. Parts only. Furnish two (2) fuses for service disconnect switches P8. Parts only.
Task 7: Repair two (2) 30 HP Fybroc pump with rebuild kit Disassemble Pump Replace mechanical seal Replace bearings Replace Case Gasket Balance Impeller Install New ISO Mag Seals Assemble pump Air test for leaks. Parts supply: Furnish one full Rebuild kit 30 HP Fybroc pump. Parts only.
Task 8: Furnish one (1) ABB 30 hp VFD (parts only) Place of Performance NOAA/NMFS 110 McAllister Way Santa Cruz, CA 95060
THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE PROPOSALS AND NO SOLICITATION PACKAGE IS AVAILABLE. HOWEVER, FIRMS THAT BELIEVE THEY CAN FULLY MEET THE GOVERNMENT'S REQUIREMENTS MAY SUBMIT SUBSTANTIATING DOCUMENTATION IN WRITING TO THE IDENTIFIED POINT OF CONTACT WITHIN 15 DAYS AFTER PUBLICATION OF THIS SYNOPSIS. SUCH DOCUMENTATION WILL BE EVALUATED SOLELY FOR THE PURPOSE OF DETERMINING WHETHER OR NOT TO CONDUCT THIS PROCUREMENT ON A COMPETITIVE BASIS. A DETERMINATION BY THE GOVERNMENT NOT TO CONDUCT A COMPETITIVE PROCUREMENT, BASED UPON RESPONSES TO THIS NOTICE, IS SOLELY WITHIN THE DISCRETION OF THE GOVERNMENT. ORAL COMMUNICATIONS ARE NOT ACCEPTABLE IN RESPONSE TO THIS NOTICE.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- DXP Enterprises, Inc.
- UEI
- WPGFV4MACGA1
- CAGE
- 1Q486
- Vendor location
- Houston, TX
- Contract
- 1333MF24P0053, purchase order
- Obligated
- $118,140.00
- Actions
- 1 between March 27, 2024 and March 27, 2024
- Competition
- Not Competed Under SAP, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- The Southwest Fisheries Science Center, Santa Cruz Laboratory Requires Three-Phase Pump Repairs, and Several VFD Replacements to the Boiler Water System, Condenser Water System and Chilled Water System. the Contractor Shall Furnish Nine (9) VFDS and
- Match
- award number 1333MF24P0053 equals the contract number; same awarding office 1333MF (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 27, 2024
Justification
SAM.gov, notice 56db030c9ef64c6b997e8939a6eaafcb
Points of contact
- Kimberla FairleyKimberla.Fairley@noaa.gov8585467009
Also open from this buyer
- 26-482 SEFSC Deep Coral Reef Monitoring Program SuCombined synopsis and solicitationSmall businessNAICS 5419901333MF26Q0099Closes todaySep 18
- PR GATHERING ESSENTIAL LIFE HISTORY INFORMATIONCombined synopsis and solicitationSmall businessNAICS 5416901333MF26Q0115Closes tomorrowSep 19
- FD26-521 Miami Gate and Annex Water repairCombined synopsis and solicitationSmall businessNAICS 5612101333MF26Q0118Closes in 6 daysSep 24