Solicitation, total small business set-aside
Hiawatha Bridge Replacement
12445524R0040
Forest Service, Usda-Fs, Csa East 13. Highway, Street, and Bridge Construction.
Response deadline
October 29, 2024 at 4:00 PM EDT
Closed 689 days ago. Posted September 30, 2024. Scheduled to archive November 13, 2024.
Description
As published on SAM.gov.
Replace an existing 18-foot-wide by 22.3-foot-span by 7.3-foot-rise concrete bridge with wingwalls over North Branch Stutt's Creek with a new 18-foot-wide by 36-foot-span by 5.7-foot-rise timber clear span bridge with wingwalls.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 30, 2024
Solicitation, originally presolicitation
Due October 29, 2024 at 4:00 PM EDT. SAM.gov, notice 496716870cd34d10bf75cb917cd69bdd
Points of contact
- Christopher Malleychristopher.malley@usda.gov