Presolicitation, total small business set-aside
Hiawatha Bridge Replacement
12445524R0012
Forest Service, Usda-Fs, Csa East 13. Highway, Street, and Bridge Construction.
Response deadline
August 24, 2024 at 12:00 PM EDT
Closed 754 days ago. Posted August 9, 2024. Scheduled to archive September 8, 2024.
Description
As published on SAM.gov.
The USDA Forest Service (FS), East Zone, has an anticipated requirement to provide materials, labor, equipment, and expertise to complete the replacement of an existing 18-foot-wide by 22.3-foot-span by 7.3-foot-rise concrete bridge with wingwalls over North Branch Stutt's Creek with a new 18-foot-wide by 36-foot-span by 5.7-foot-rise timber clear span bridge with wingwalls.
Excavate 12 cubic yards below the Ordinary High Water Mark (OHWM) of the stream to install footings, and backfill with 51 cubic yards of riprap below OHWM. Complete an equal cut and fill of 50 cubic yards of riprap between the OHWM and 100-year floodplain elevation. Complete 18 cubic yards of excavation, and place 51 cubic yards of riprap backfill within the adjacent shrub-scrub wetland; within a total area of 550 square feet.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 9, 2024
Presolicitation
Due August 24, 2024 at 12:00 PM EDT. SAM.gov, notice ab476c9d6a53498492f2b941dfa4dd8a