Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Lagoon Aeration

12441925Q0005

Forest Service, USDA Forest Service-Spoc East. Water and Sewer Line and Related Structures Construction.

Response deadline

December 16, 2024 at 2:00 PM EST

Closed 640 days ago. Posted November 25, 2024. Scheduled to archive December 31, 2024.

Description

As published on SAM.gov.

Work for this project requires the contractor to be responsible for for furnishing and supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized in the SOW:

1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect.

2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.

3. Furnish and install microbubble lagoon aeration system consisting of the following:

a. Control panel with individual motor overload protection circuit breakers.

b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each).

4. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure.

5. Furnish third-party inspection of electrical work included in this contract. The magnitude of this project is between $25,000.00 and $100,000.00

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 25, 2024

    Combined synopsis and solicitation

    Due December 16, 2024 at 2:00 PM EST. SAM.gov, notice 599c221bf09648d3807bde89fdde9249

Points of contact