Solicitation, total small business set-aside, first published as presolicitation
Kendall Gravel Pit Development
1240LT24R0036
Forest Service, Bridger-Teton National Forest. Construction Sand and Gravel Mining.
Response deadline
May 28, 2024 at 7:00 PM EDT
Closed 842 days ago. Posted May 14, 2024, first published April 3, 2024. Scheduled to archive June 12, 2024.
Description
As published on SAM.gov.
The Bridger Teton National Forest (BTNF), Kendall Gravel Pit Development project consists of pit development, crushing, addition of commercial bentonite, stockpiling of road surface material, and pit reclamation. The material for this project shall be produced by developing and excavation in the pit area on site. Any small trees or brush that exist in the proposed excavation area shall be piled on site at an approved location. All finished side slopes shall be 3:1. The bottom of the excavation site that is not used for floor of stockpile shall be scarified and sloped to drain out of the pit and away from any streams, rivers, or lakes.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 3, 2024
Presolicitation
Due May 28, 2024 at 7:00 PM EDT. SAM.gov, notice d7d8db3af5c74ee7939ddbb2de40dca9
April 18, 2024
Solicitation
Due May 28, 2024 at 7:00 PM EDT. SAM.gov, notice 22832eb393fe4b138be68063e3549ab3
May 14, 2024
Solicitation
Due May 28, 2024 at 7:00 PM EDT. SAM.gov, notice fe42283d9bf34b3fb622ae49056d0cec
Points of contact
- Derrick A Dodsonderrick.dodson@usda.gov
- Katy Bilisolykaty.bilisoly@usda.gov