# Zach Davidson Excavation LLC

Canonical: https://abierto.us/vendors/zach-davidson-excavation-llc-q4q1j7p76xp2

- UEI: Q4Q1J7P76XP2
- CAGE: 20RJ6
- Location: Harrison, AR
- Awards in window: 1 (1 transactions), $353,000 obligated, August 14, 2026 to August 14, 2026

## Awarding agencies

- Forest Service: 1 awards, $353,000

## Industries

- 237310 Highway, Street, and Bridge Construction: $353,000

## Competition

- Competed Under SAP: 1 awards

## Largest awards

- 12363N26P4023 (purchase order): $353,000, Usda-Fs, Stewardship Contracting Branch. The Existing Piping and Control Structure at Beaver Lake Have Failed Resulting in the Water Surface Elevation Dropping Almost 7-FT. Existing Corrugated Metal Piping Will Be Replaced with Reinforced Concrete Piping. New Filter Drain, Plunge Pool, and. https://www.usaspending.gov/award/CONT_AWD_12363N26P4023_12C2_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/zach-davidson-excavation-llc-q4q1j7p76xp2.