# Williams Construction & Cabinetry, Inc.

Canonical: https://abierto.us/vendors/williams-construction-and-cabinetry-inc-g8n5fnkppmy5

- UEI: G8N5FNKPPMY5
- CAGE: 464T1
- Location: Robbinsville, NC
- Awards in window: 34 (64 transactions), $65,460,572 obligated, January 13, 2025 to September 10, 2026

## Awarding agencies

- Forest Service: 27 awards, $54,044,014
- Federal Highway Administration: 3 awards, $9,766,058
- U.S. Fish and Wildlife Service: 3 awards, $1,122,000
- National Park Service: 1 awards, $528,500

## Industries

- 237310 Highway, Street, and Bridge Construction: $48,593,183
- 236220 Commercial and Institutional Building Construction: $16,669,995
- 237990 Other Heavy and Civil Engineering Construction: $197,394
- 115310 Support Activities for Forestry: $0

## Competition

- Full and Open Competition After Exclusion of Sources: 22 awards
- Competed Under SAP: 11 awards

## Solicitations won

- Cherokee National Forest Project TN ERFO FS CHRKE804 2020-2(4) (693C73-26-B-000010), $6,435,689. https://abierto.us/opportunities/693c7326b000010

## Largest awards

- 12363N26F4078 (delivery order): $11,652,149, Usda-Fs, Stewardship Contracting Branch. Denton Valley Road and Bridge Project Includes Replacement of 1 Bridge and Repair 30 Miles of Road. Watauga, White Rock Tower, Denton Valley,& Camp Ahistadi Bridge Repairs. https://www.usaspending.gov/award/CONT_AWD_12363N26F4078_12C2_140FGA23D0142_1448/
- 12363N26F4093 (delivery order): $7,470,368, Usda-Fs, Stewardship Contracting Branch. Unaka Road Repairs from Hurricane Helene. Replacement or Repair of 22 Miles of Road.. https://www.usaspending.gov/award/CONT_AWD_12363N26F4093_12C2_12445224D0042_12C2/
- 693C7326C000012 (definitive contract): $6,435,689, 693C73 Eastern Fed Lands Division. Project TN Erfo FS Chrke804 2020-2(4): the Project Consists of Repairing Storm and Flood Damage on Little Gassaway Road (Fs 45) and Sina Branch Road (Fs 67). Project Work Includes Grading, Roadway Resurfacing, Drain Dip Construction, Replacement O. https://www.usaspending.gov/award/CONT_AWD_693C7326C000012_6925_-NONE-_-NONE-/
- 12445225F0037 (delivery order): $6,390,028, Usda-Fs, Csa East 12. Oswald Dome Gaoa/Erfo & Flood Recovery Sacc II to. https://www.usaspending.gov/award/CONT_AWD_12445225F0037_12C2_12445224D0042_12C2/
- 12445225F0036 (delivery order): $4,333,254, Usda-Fs, Csa East 12. Nantahala Ranger District Road Maintenance - Wayah. https://www.usaspending.gov/award/CONT_AWD_12445225F0036_12C2_12445224D0042_12C2/
- 12445525F0024 (delivery order): $4,228,500, Usda-Fs, Csa East 13. The Proposed Work Includes Emergency Hazardous Debris Removal Along the Pigeon River on Federal Lands to Manage Immediate Threats to Public Health and Safety, Protect the Local Economy, and Minimize the Introduction of Contaminants Into the Nearby Wa. https://www.usaspending.gov/award/CONT_AWD_12445525F0024_12C2_12445221D0013_12C2/
- 12445226F0016 (delivery order): $3,624,816, Usda-Fs, Csa East 12. Repair the Haul Roads for This Effort in Preparation for Hauling the Timber Out of Damaged Areas.. https://www.usaspending.gov/award/CONT_AWD_12445226F0016_12C2_12445224D0042_12C2/
- 12445225F0028 (delivery order): $3,518,622, Usda-Fs, Csa East 12. 2025 Grandfather Ranger District Road Rehabilitation West. https://www.usaspending.gov/award/CONT_AWD_12445225F0028_12C2_12445224D0042_12C2/
- 693C7326F00062N (delivery order): $3,330,369, 693C73 Eastern Fed Lands Division. Project NP Ser PMS FY25(1) the Project Consists of the Pavement Preservation of Identified Roadways and Parking Areas, as Well as the Rehabilitation of Dry Creek Bridge. the Work Includes Thin Lift Overlay of Asphalt Concrete Pavement, Stress Absorb. https://www.usaspending.gov/award/CONT_AWD_693C7326F00062N_6925_693C7326D000012_6925/
- 12445225F0027 (delivery order): $3,275,154, Usda-Fs, Csa East 12. Grandfather Ranger District Road Rehabilitation East. https://www.usaspending.gov/award/CONT_AWD_12445225F0027_12C2_12445224D0042_12C2/
- 12445225F0050 (delivery order): $3,211,464, Usda-Fs, Csa East 12. Replacement of Bridges 475-3.3 and 475-4.2 on NFSR 475 - Davidson River Road & Cove Creek. https://www.usaspending.gov/award/CONT_AWD_12445225F0050_12C2_12445224D0056_12C2/
- 12445224F0065 (delivery order): $1,896,950, Usda-Fs, Csa East 12. The Purpose of This Modification Addresses Adding Aggregate Surfacing to Indian CR RD 302. https://www.usaspending.gov/award/CONT_AWD_12445224F0065_12C2_140F0822D0130_1448/
- 12445225F0019 (delivery order): $1,505,916, Usda-Fs, Csa East 12. Class Exception Disaster Recovery Bli ER02 - East Sylco Ridge 1333 Erfo Repair. https://www.usaspending.gov/award/CONT_AWD_12445225F0019_12C2_140F0822D0130_1448/
- 12445225F0022 (delivery order): $1,367,653, Usda-Fs, Csa East 12. Disaster Exclusion: Bli Cmso (Dcnc Funding). https://www.usaspending.gov/award/CONT_AWD_12445225F0022_12C2_12445224D0042_12C2/
- 12445225F0049 (delivery order): $1,257,480, Usda-Fs, Csa East 12. Little Sylco Erfo Repair. https://www.usaspending.gov/award/CONT_AWD_12445225F0049_12C2_140F0822D0130_1448/
- 12445225F0017 (delivery order): $1,132,100, Usda-Fs, Csa East 12. Moratorium Class Exception Disaster-Old Hwy NFSR 311 Erfo RD Repair. https://www.usaspending.gov/award/CONT_AWD_12445225F0017_12C2_12445224D0042_12C2/
- 140FHR24F0021 (delivery order): $1,122,000, Fws, Hurricane & Recovery. Modification: Cape Romain National Wildlife Refuge (Nwr)sc Design Changes to Demolish Existing Concrete Breakwater. https://www.usaspending.gov/award/CONT_AWD_140FHR24F0021_1448_140FGA23D0142_1448/
- 140PS125F0069 (delivery order): $528,500, Doi, NPS Conops Strategic. Repair of Sewer Force Main at Carl. https://www.usaspending.gov/award/CONT_AWD_140PS125F0069_1443_140F0822D0130_1448/
- 12445225F0012 (delivery order): $191,600, Usda-Fs, Csa East 12. Lake Powhatan Waterline Repairs & Debris Clearing. https://www.usaspending.gov/award/CONT_AWD_12445225F0012_12C2_12445224D0042_12C2/
- 12445226F0036 (delivery order): $129,574, Usda-Fs, Csa East 12. Uwharrie Ohv Trail Maintenance. https://www.usaspending.gov/award/CONT_AWD_12445226F0036_12C2_12445223D0032_12C2/
- 12445224C0012 (definitive contract): $67,820, Usda-Fs, Csa East 12. The Purpose of This Modification Is to Extend Current Pop Ending 5/15/25 to 7/31/25.. https://www.usaspending.gov/award/CONT_AWD_12445224C0012_12C2_-NONE-_-NONE-/
- 12445224F0012 (delivery order): $61,785, Usda-Fs, Csa East 12. The Purpose of This Modification Is to Support Installation of Boat Ramp Lighting and Extend the Pop 83 Days.. https://www.usaspending.gov/award/CONT_AWD_12445224F0012_12C2_12445221D0013_12C2/
- 12445224F0026 (delivery order): $58,180, Usda-Fs, Csa East 12. English Chapel Bridge Design & Build. https://www.usaspending.gov/award/CONT_AWD_12445224F0026_12C2_140FGA23D0142_1448/
- 12445223F0058 (delivery order): $21,780, Usda-Fs, Csa East 12. White Oak Flats Design-Build Erfo Project (Idiq). https://www.usaspending.gov/award/CONT_AWD_12445223F0058_12C2_12445221D0013_12C2/
- 12441923F0054 (delivery order): $0, USDA Forest Service-Spoc East. NFSR 126 Great Lake Road Repairs. https://www.usaspending.gov/award/CONT_AWD_12441923F0054_12C2_140F0822D0130_1448/
- 12445223F0078 (delivery order): $0, Usda-Fs, Csa East 12. The Purpose of This Modification Is to Extend the Pop from 1/28/25 to 2/28/25.. https://www.usaspending.gov/award/CONT_AWD_12445223F0078_12C2_12445221D0013_12C2/
- 12445224F0052 (delivery order): $0, Usda-Fs, Csa East 12. Project: Appalachian Road Maintenance- NFNC Mod 002 Administrative Changes to Correct Clerical Errors in Soi/Activity Schedule. https://www.usaspending.gov/award/CONT_AWD_12445224F0052_12C2_12445221D0013_12C2/
- 12445224F0077 (delivery order): $0, Usda-Fs, Csa East 12. Purpose of This Modification Is to Correct Pop End Date to Date of Task Order Pop to 11/17/24 So System Can Close Out Contract. https://www.usaspending.gov/award/CONT_AWD_12445224F0077_12C2_12445223D0021_12C2/
- 12363N26A4026: $0, Usda-Fs, Stewardship Contracting Branch. Land Management Integrated Resources (Lmir) BPA. https://www.usaspending.gov/award/CONT_IDV_12363N26A4026_12C2/
- 12445224D0042: $0, Usda-Fs, Csa East 12. Modification to Change Co and Update Clauses to Reflect Executive Orders. Sacc II Multiple Award Indefinite Delivery/Indefinite Quantity (Idiq) Construction Contract - Williams Construction & Cabinetry, INC.. https://www.usaspending.gov/award/CONT_IDV_12445224D0042_12C2/
- 140F0822D0130: $0, Fws, Gaoa. Mod 3: the Purpose of This Modification Is to Ensure Compliance with Updated Federal Guidance and to Eliminate Non-Statutory Sustainability Requirements, as Well as Enhance the Representational and Certification Clauses Within the Contract.. https://www.usaspending.gov/award/CONT_IDV_140F0822D0130_1448/
- 140FGA23D0142: $0, Fws, Gaoa. The Purpose of This Modification Is to Ensure Compliance with Updated Federal Guidance and to Eliminate Non-Statutory Sustainability Requirements, as Well as Enhance the Representational and Certification Clauses Within the Contract.. https://www.usaspending.gov/award/CONT_IDV_140FGA23D0142_1448/
- 693C7326D000012: $0, 693C73 Eastern Fed Lands Division. South-Atlantic Region Construction Matoc: Indefinite Delivery, Indefinite Quantity (Idiq) Contract to Perform Subsequent Task Orders for Highway, Street, And/Or Bridge Construction Services, Potentially with Incidental Design Services And/Or Desig. https://www.usaspending.gov/award/CONT_IDV_693C7326D000012_6925/
- 12445223F0071 (delivery order): -$1,351,179, Usda-Fs, Csa East 12. The Purpose of This Modification Is to Extend the Pop by 309 Days Due to the Delay in Project Progress Because of a Forest Service Electrical Issue at the Project Site and the Need to Drill at a Second Location for the Drinking Water Well. Changing. https://www.usaspending.gov/award/CONT_AWD_12445223F0071_12C2_140F0822D0130_1448/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/williams-construction-and-cabinetry-inc-g8n5fnkppmy5.